A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()
第1题:
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()
第2题:
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()
第3题:
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()
第4题:
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()
第5题:
A customer has purchased an IBM BladeCenter H chassis and needs the following servers: --Two HS21 blade servers each with 8GB memory and 2 drives --Two HS21 blade servers each with 24GB memory and 2 drives --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives How many total server bays will be required for this configuration?()
第6题:
A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()
第7题:
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()
第8题:
A media customer has an IBM BladeCenter E with ten HS22 Blade server installed. Currently only one Ethernet port is available for each server. What is required to enable the second port on eachserver?()
第9题:
An IBM BladeCenter H chassis for the JS22 Blade servers
A concurrent KVM daughter card
A pair of IBM BladeCenter Power Supplies
A second Management Module
第10题:
Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modules
Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modules
Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modules
Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
第11题:
4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server
Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module
Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module
Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server
第12题:
Fibre Channel Expansion Card for each Blade Server
cKVM Card for each Blade Server
iSCSI Expansion Card for each Blade Server
4Gb Modular Flash Drive
第13题:
A customer wants to boot from SAN with their IBM BladeCenter infrastructure. What is required for the customer to be able to perform this? ()
第14题:
A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()
第15题:
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
第16题:
A customer wants to boot from an iSCSI SAN with their IBM BladeCenter infrastructure running Microsoft Windows Server 2000. What is required for the customer to be able to perform this?()
第17题:
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()
第18题:
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()
第19题:
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM). What TRUE statement should be mentioned to the customer regarding the OPM?()
第20题:
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()
第21题:
Two additional power supplies
Fibre Channel (FC) switches and SAN storage
A Nortel 1/10 GB ESM
SSD for the HX5
第22题:
Back up the AMM configuration to a file
Back up the AMM configuration to the chassis
Back up the AMM using IBM Systems Director
Back up the AMM using Tivoli Storage Manager
第23题:
12
10
8
6