A customer is looking for a low-cost pSeries solution. The pSeries technical specialist is recommending several p650 Express Configurations. When reviewing the options with the customer, the pSeries technical specialist should emphasize which of the following limitations?()
第1题:
A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()
第2题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第3题:
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
第4题:
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
第5题:
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第6题:
The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()
第7题:
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()
第8题:
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()
第9题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第10题:
The technical support specialist has completed a UNIX course at college.
The technical specialist has supported several similar projects and has earned an IBM AIX certification.
The technical support specialist’s company sells $3M of UNIX computer systems every year.
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
第11题:
Have the PDU requirements been met?
Are there sufficient KVM connections?
Is there sufficient service clearance?
Is there sufficient space in the existing rack?
第12题:
A customer needs a solution that provides a total of eight processors (four active and four inactive), 16GB of memory, Advanced POWER Virtualization, and the ability to grow. Which of the followingsystems should the pSeries technical specialist propose?()
第13题:
The pSeries technical specialist just finished reviewing the system configurations with the customer. The customer requested that many of the availability options,initially configured,be removed due to budgetary constraints. What should be done next?()
第14题:
A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IBM offering?()
第15题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第16题:
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
第17题:
A customer is ready to order a pSeries solution. However, the pSeries technical specialist is unsure whether the customer preferred the fibre channel or the external SCSI disk attachment option. What is the most appropriate action for the specialist to take next?()
第18题:
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()
第19题:
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()
第20题:
The pSeries technical specialist of a Premier Tier 1 Business Partner has been working on a design for a four LPAR p5-570 Express solution. The specialist has received conflicting information regarding sharing the IDE DVD-RAM drive between different LPARs. Who should the technical specialist contact to gain a definitive answer?()
第21题:
A DCE domain
A Kerberos domain
A PPP tunnel between the servers
An IPSEC tunnel between the servers
第22题:
p650
p5-570
Two p630s
p5-570 Express