Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()
第1题:
Companycom has five LPARs, but only one CD drive. How should the CD drive be shared among all the users without system administrator action?()
第2题:
Companycom has restored their mksysb. They notice that the external volume groups cannot be seen. What should be done to access the volume groups?()
第3题:
Companycom has a Linux LPAR on a p5 570 server. The 3rd party storage subsystem devices are not supported by Linux. How would access be provided to the storage subsystem devices for this Linux LPAR?()
第4题:
After rebooting the machine, Companycom notices that the machine is not performing as well as before. The applications are running slower, and their CPU utilization has increased. How can the customer check to see if a CPU was deallocated?()
第5题:
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
第6题:
APV, AIX5.2ML4
AIX5.3 or i5/OS
APV, i5/OS, AIX5.3
APV, AIX5.3 or SuSE9
第7题:
The files have grown to over eight gigabytes in size
The file systems are corrupt, and fsck should be run
The tape block size has been changed from the default
The user’s limit has been changed to less than eight gigabytes
第8题:
From the HMC
From a NFS mount
From a FTP server
From any CD or DVD drive on another server
第9题:
One single port Ethernet adapter
Four dual port Ethernet adapters
Two single port Ethernet adapters
Eight single port Ethernet adapters
第10题:
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()
第11题:
Companycom informs the system administrator that there is concern about the Electronic Service Agent and security. What can be said about Electronic Service Agent that will address concerns about security?()
第12题:
Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()
第13题:
Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment. What solution would they use to avoid downtime for OS software maintenance?()
第14题:
8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor
4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor
8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
第15题:
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS
Use DLPAR to move resources from the test LPAR to training when training is active
Install Partition Load Manager to share resources between the test and training environments
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
第16题:
Utilize the integrated 10/100/1000 network interface
Implement Virtual Ethernet to enable inter-partition communication
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
Implement a Point to Point protocol serial communication between the p5 595 serial ports
第17题:
Use alt_disk_install
Backup image to NIM server
Backup using mksysb to DVD-RAM
Apply the upgrade and do not commit
第18题:
Use shared memory and semaphores to transfer the data to the TSM LPAR
Provide gigabit Ethernet adapters in each LPAR and run a crossover cable
Create a Virtual Ethernet between the production server and the TSM LPARs
Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs