After performing the initial steps in installing the server OS from a DVD-ROM, the server reboots and goes back into the setup wizard. Which of the following is the MOST likely cause for this problem?()
第1题:
After performing a copy backup of a file server, the archive bit on the backed up files will be which of the following?()
第2题:
An application fails to start after a Technology Level upgrade. The application vendor recommends that two filesets upgraded as part of the new Technology Level be rejected. What is the recommended method for performing this task?()
第3题:
After rebooting the machine, Companycom notices that the machine is not performing as well as before. The applications are running slower, and their CPU utilization has increased. How can the customer check to see if a CPU was deallocated?()
第4题:
You work as a database administrator for Certkiller .com. In the Certkiller PRODUCTION database you have granted RESUMABLE system privilege to the CONNECT role.Resumablespace operation has been enabled for all user session. You want users NOT to be aware of any kind of space-related problems while performing transactions. Instead, you want the problem to be resolved by a database trigger automatically. Which combination of triggering time and event would you use to achieve this objective?()
第5题:
You are performing a database recovery because a user’s schema is dropped. While performing the recovery, you use the UNTIL SEQUENCE clause. Which type of database recovery are you performing?()
第6题:
While performing the backup of the datafile,data1.dbf,one backup set is created.
While performing the backup of the datafile,data1.dbf,two backup sets are created.
While performing the backup of the datafile,data1.dbf,three backup sets are created.
While performing the backup of the datafile,data1.dbf,the command for performing a backup of the datafile,data1.dbf,will fail.
第7题:
user managed complete recovery
user managed incomplete recovery
RMAN-based complete recovery
RMAN-based incomplete recovery
第8题:
The DVD-ROM drive has failed.
An installation file copied from the DVD to the hard drive is corrupt.
Faulty OS installation DVD
Incorrect boot sequence in the BIOS
第9题:
at the same time
one after another
two first and then the other
one first and then the other two
第10题:
Applying the BIOS settings in the incorrect order
Power being lost during the upgrade process
Installing the OS before applying the BIOS upgrade
Imaging the system after performing a BIOS upgrade
第11题:
The online redo log files and online data files are opened.
All the online data file headers are checked for consistency.
Instance recovery is performed before opening the database.
The path and existence of all the log file members are checked
第12题:
When is it advisable to dump the waste toner from a technicians service vacuum?()
第13题:
An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()
第14题:
A system administrator needs to replace a mirrored disk. After performing the proper removal process and replacing the disk, which of the following set of commands should be performed to bring the disk back into production?()
第15题:
The size of the largest datafile, data1.dbf, in your database is 30MB. You issued the following command: RMAN>CONFIGURE MAXSETSIZE 10MB; What will be the impact of the above setting?()
第16题:
You perform the following activities during the database upgrade from Oracle Database 10g to Oracle Database 11g: 1. Capture plans for a SQL workload into a SQL Tuning Set (STS) before upgrade. 2. Load these plans from the STS into the SQL plan baseline immediately after the upgrade. What is the reason for performing these activities? ()
第17题:
Use refresh -s sshd
Use init.sshd /etc/rc.ssh
Use /usr/sbin/sshd -restart
Use stopsrc -s sshd and then startsrc -s sshd
第18题:
The log sequence for the database will restart from 1.
The log sequence number will be written to the control file.
The log sequence number will be written to the datafile headers.
The log sequence number will be written to the initialization parameter file.
第19题:
reboot, mklvcopy, syncvg
cfgmgr -vl ssar, chvg -va, syncvg
cfgmgr, extendvg, syncvg
extendvg, mklvcopy, syncvg
第20题:
The online redo log files and online data files are opened.
All the online data file headers are checked for consistency.
Instance recovery is performed before opening the database.
The path and existence of all the log file members are checked
第21题:
to minimize plan regression due to the use of a new optimizer version
to completely avoid the use of new plans generated by a new optimizer version
to prevent plan capturing when the SQL statement is executed after the database upgrade
to keep the plan in the plan history so that it can be used when the older version of the optimizer is used
第22题:
Deleted
Unchanged
Set
Copied