Run smit update_all
Run smit install_all
Boot from the installation media
Run update_all from the mounted CD
第1题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第2题:
What are the steps required to perform a Preservation install on a server?()
第3题:
Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()
第4题:
A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()
第5题:
Which of the following actions will allow you to convert from Windows Server 2012 R2 Standard to Windows Server Datacenter, using the least administrative effort?()
第6题:
Migration installation
Partition Mobility
alt_disk_install
update_all smit fastpath and reboot during the next scheduled outage
第7题:
You should run Setup from the installation media.
You should run the Install-WindowsFeature cmdlet from the Windows PowerShell.
You should run the dism /online /add-package command from an elevated command prompt.
You should run the dism /online /enable-feature command from an elevated command Prompt.
You should run the dism /online /set-edition command from an elevated command prompt.
第8题:
IBM Techline
IBM Supportline
IBM Software Distribution
IBM Hardware Support
第9题:
Run smit update_all
Run smit install_all
Boot from the installation media
Run the update_all command from the mounted CD
第10题:
Run smit update_all
Run smit install_all
Boot from the installation media
Run update_all from the mounted CD
第11题:
Run standalone diagnostics from the cd.
Run standalone diagnostics from the AIX tape.
Run maintenance mode diagnostics from the hard drive.
Run maintenance mode diagnostics from the diskette.
第12题:
Shutdown the server and boot it into SMS.Select SMS menu option OS Upgrade,Preservation install for the install type,and allow upgrade to run
Shut down the server and perform a network boot from a local NIM server.Select Presevation install for the install type,and allow upgrade to run
Shutdown the server and boot it into SMS.Select SMS menu option OS Upgrade,Presevation install for the install type,and allow for upgrade to run
Re-boot the server and NFS mount the bos images from a local NIM server.Run smit install.Select Presevation install for the install type,and allow upgrade to run
第13题:
An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()
第14题:
A system administrator needs to quickly migrate a machine from AIX 5.1 to AIX 5.2. The administrator will only be allowed enough downtime to reboot the machine. Which installation method should be used to accomplish this task?()
第15题:
A system was running properly until a reboot. Following the reboot, the system LED displayed cycles between 0223 and 0229. Which of the following procedures should be performed next?()
第16题:
A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3. Which of the following installation methods would minimize downtime()
第17题:
A system administrator has a mksysb on tape of an AIX 5.2 machine and needs to install it on a different server. How can this be accomplished?()
第18题:
Use the clstat command and verify the cluster is in a stable state
After each node is upgraded, run a verification and synchronization
After all nodes are upgraded, run a verification and synchronization
Take a snapshot of each node and verify the configuration is the same
第19题:
Shutdown the server and boot it into SMS. Select SMS menu option OS Upgrade, Preservation install for the install type, and allow upgrade to run.
Shut down the server and perform a network boot from a local NIM server. Select Presevation install for the install type, and allow upgrade to run.
Shutdown the server and boot it into SMS. Select SMS menu option OS Upgrade, Presevation install for the install type, and allow for upgrade to run.
Re-boot the server and NFS mount the bos images from a local NIM server. Run smit install. Select Presevation install for the install type, and allow upgrade to run.
第20题:
Verify the ISV application runs on AIX 5.2
Power4 to POWER5 upgrades are not supported without a application recompile
Check the placement and size of the boot logical volume and disk space requirements on the S85
AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
第21题:
Preservation Install
Retention Install
Overwrite Install
Migration Install
第22题:
Perform a migration installation during the reboot process.
Perform an alternate disk installation and migration using NIM.
Copy the /usr directory from another 5.2 server to this server.
Perform an update_all install from 5.2 media to take effect on reboot.
第23题:
Install the base AIX from 5.2 media and then install the mksysb overtop.
Mount the tape and use the tar command to install AIX and the rest of the contents of the rootvg.
Insert the mksysb tape and a 5.2 base media CD and then boot to maintenance mode and initiate the install.
Install AIX 5.2 from base media and then perform an update_all install from the mksysb tape of the original machine.
第24题:
Power down then power up the system
Boot into diagnostic mode and run fsck
Boot from installation media and run bosboot
Boot into maintenance mode and check the bootlist