itgle.com

单选题In which phase should a TDA be performed of the following?()A Server deploymentB Installation and server configurationC Problem determination / resolutionD Needs analysis and design

题目
单选题
In which phase should a TDA be performed of the following?()
A

Server deployment

B

Installation and server configuration

C

Problem determination / resolution

D

Needs analysis and design


相似考题
更多“单选题In which phase should a TDA be performed of the following?()A Server deploymentB Installation and server configurationC Problem determination / resolutionD Needs analysis and design”相关问题
  • 第1题:

    When a technician left the server room Monday evening everything was operational. When the technician returned Tuesday morning, the front bezel was off of the mail server, and it had been powered off. Which of the following should be checked FIRST?()

    • A、TCP/IP settings
    • B、RAID configuration
    • C、Whether the power cord is attached
    • D、Server room access log

    正确答案:D

  • 第2题:

    An administrator is running proprietary server software that requires services to be reconfigured every time the server is upgraded to the latest vendor version. Which of the following is the BEST solution to address this problem?()

    • A、The current system configuration should be documented for future use.
    • B、Server diagramming and environmental topologies should be documented.
    • C、A copy of the latest pre-installation plan should be developed and utilized.
    • D、Vendor support should be contacted so that they can correct the issue.

    正确答案:D

  • 第3题:

    Which of the following is an environmental server maintenance task that should be performed every three months?()

    • A、Replace the rubber mats in the server room
    • B、Clean the servers to limit dust buildup
    • C、Wash the outside of the servers
    • D、Replace the server fans

    正确答案:B

  • 第4题:

    An administrator is troubleshooting a problem on an application server, but has not determined the cause of the problem and is not able to replicate the problem.  Which of the following should the administrator do prior to escalating the issue?()

    • A、 Gather information from users.
    • B、 Reboot the server.
    • C、 Apply the latest service packs to the operating system.
    • D、 Perform a root cause analysis.

    正确答案:A

  • 第5题:

    In which phase should a TDA be performed of the following?()

    • A、Server deployment
    • B、Installation and server configuration
    • C、Problem determination / resolution
    • D、Needs analysis and design

    正确答案:D

  • 第6题:

    单选题
    In which phase should a TDA be performed?()
    A

    Server deployment 

    B

    Installation and server configuration 

    C

    Problem determination/resolution 

    D

    Needs analysis and design


    正确答案: D
    解析: 暂无解析

  • 第7题:

    单选题
    Which of the following should be done before and after a service or repair is performed on a server?()
    A

    Defrag

    B

    IPCONFIG /release

    C

    Firmware update

    D

    Baseline


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    Which of the following is an environmental server maintenance task that should be performed every three months?()
    A

    Replace the rubber mats in the server room

    B

    Clean the servers to limit dust buildup

    C

    Wash the outside of the servers

    D

    Replace the server fans


    正确答案: D
    解析: 暂无解析

  • 第9题:

    单选题
    An administrator is running proprietary server software that requires services to be reconfigure devery time the server is upgraded to the latest vendor version.  Which of the following is the BEST solution to address this problem?()
    A

     The current system configuration should be documented for future use.

    B

     Server diagramming and environmental topologies should be documented.

    C

     A copy of the latest pre-installation plan should be developed and utilized.

    D

     Vendor support should be contacted so that they can correct the issue.


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    A server will not power on. Which of the following devices should the administrator use FIRST to determine the problem?()
    A

    Loop back plugs

    B

    Power supply tester

    C

    System logs

    D

    TDR


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A network technician arrives to work and discovers users are having a problem connecting the company server. The server operator was working on upgrades the night before. Which of the following documents should the technician use to attempt to discover the problem?()
    A

    Network maps

    B

    Change management

    C

    Baselines

    D

    Cable management


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    An administrator is troubleshooting a problem on an application server, but has not determined the cause of the problem and is not able to replicate the problem. Which of the following should the administrator do prior to escalating the issue?()
    A

    Gather information from users.

    B

    Reboot the server.

    C

    Apply the latest service packs to the operating system.

    D

    Perform a root cause analysis


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A server has failed after a tested and scheduled change control has been implemented.  Which of the following is the FIRST thing the server technician should do?()

    • A、Perform a root cause analysis.
    • B、Escalate the problem.
    • C、Notify stakeholders.
    • D、Establish a plan of action.

    正确答案:C

  • 第14题:

    Which of the following should be done before and after a service or repair is performed on a server?()

    • A、 Defrag
    • B、 IPCONFIG /release
    • C、 Firmware update
    • D、 Baseline

    正确答案:D

  • 第15题:

    An administrator has encountered a problem with a particular piece of software installed on the server and begins the troubleshooting process. Which of the following is the FIRST place the administrator should look for specific information about the problem?()

    • A、The supporting documentation
    • B、The vendor website
    • C、The Internet
    • D、The server event logs

    正确答案:D

  • 第16题:

    In which phase should a TDA be performed?() 

    • A、Server deployment 
    • B、Installation and server configuration 
    • C、Problem determination/resolution 
    • D、Needs analysis and design

    正确答案:D

  • 第17题:

    单选题
    A server has failed after a tested and scheduled change control has been implemented.  Which of the following is the FIRST thing the server technician should do?()
    A

    Perform a root cause analysis.

    B

    Escalate the problem.

    C

    Notify stakeholders.

    D

    Establish a plan of action.


    正确答案: A
    解析: 暂无解析

  • 第18题:

    单选题
    You are a professional level SQL Server 2005 database administrator in an international corporation named Wiikigo. You are experienced in implementing high-availability solutions, monitoring the database server, and design deployment. In the company, you major job is the deployment, maintenance and support of Microsoft SQL Server 2005. You work as the database administrator for your company. You find a problem that there are three reports which are running slowly. And through detailed analysis, you conclude that no error messages are generated from these reports. Not only the indexing strategy but also the status of the current indexes is tested by you. You confirm that the slow performance of the financial reports is not caused by it. Since you are the technical support, you are required to find out which statement is causing the slow performance. Which action should be performed first?()
    A

    SQL Server Profiler should be run with the Lock:Deadlock event class.

    B

    The Database Engine Tuning Advisor (DTA) f should be run or at least one hour.

    C

    SQL Server Profiler should be run with the TSQL_Duration template.

    D

    The Database Engine Tuning Advisor (DTA) should be run with the default options.


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    Which of the following is an environmental server maintenance task that should be performed every three months?()
    A

     Replace the rubber mats in the server room

    B

     Clean the servers to limit dust buildup

    C

     Wash the outside of the servers

    D

     Replace the server fans


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    Which of the following should be done before and after a service or repair is performed on a server?()
    A

     Defrag

    B

     IPCONFIG /release

    C

     Firmware update

    D

     Baseline


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    An administrator is troubleshooting a problem on an application server, but has not determined the cause of the problem and is not able to replicate the problem.  Which of the following should the administrator do prior to escalating the issue?()
    A

     Gather information from users.

    B

     Reboot the server.

    C

     Apply the latest service packs to the operating system.

    D

     Perform a root cause analysis.


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    An administrator is running proprietary server software that requires services to be reconfigured every time the server is upgraded to the latest vendor version. Which of the following is the BEST solution to address this problem?()
    A

    The current system configuration should be documented for future use.

    B

    Server diagramming and environmental topologies should be documented.

    C

    A copy of the latest pre-installation plan should be developed and utilized.

    D

    Vendor support should be contacted so that they can correct the issue.


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    An administrator has encountered a problem with a particular piece of software installed on the server and begins the troubleshooting process. Which of the following is the FIRST place the administrator should look for specific information about the problem?()
    A

    The supporting documentation

    B

    The vendor website

    C

    The Internet

    D

    The server event logs


    正确答案: A
    解析: 暂无解析