itgle.com

单选题A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()A Upgrade system firmware to latest levelB Upg

题目
单选题
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()
A

Upgrade system firmware to latest level

B

Upgrade to AIX 5.3

C

Upgrade HMC to version 6.1

D

Convert rootvg filesystems to JFS2


相似考题
更多“单选题A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()A Upgrade system firmware to latest levelB Upg”相关问题
  • 第1题:

    Prior to implementing an LPAR system, which of the following needs to be done?()

    • A、A graphics monitor must be attached to the server
    • B、Cluster System Management (CSM) software must be installed
    • C、The LPAR system must have an Hardware Management Console (HMC) connected
    • D、Each LPAR must be configured with a CDROM for operating system installation

    正确答案:C

  • 第2题:

    A production system needs to be upgraded from AIX V5.2 to AIX V5.3. All system logs and users need to be saved.  Which installation method will accomplish the upgrade()

    • A、Update Installation
    • B、Migration Installation
    • C、Preservation Installation
    • D、Mirror rootvg prior to a Preservation Installation

    正确答案:B

  • 第3题:

    An administrator issued a command to update thefirmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()

    • A、The adapter must be taken offline prior to the firmware update.
    • B、The system has not been rebooted since the adapter was added to the LPAR.
    • C、The adapter must be assigned to the service partition prior to updating the firmware.
    • D、The adapter must be dynamically removed from the LPAR prior to updating thefirmware.

    正确答案:A

  • 第4题:

    An administrator issued a command to update the firmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()

    • A、The adapter must be taken offline prior to the firmware update.
    • B、The system has not been rebooted since the adapter was added to the LPAR.
    • C、The adapter must be assigned to the service partition prior to updating the firmware.
    • D、The adapter must be dynamically removed from the LPAR prior to updating the firmware.

    正确答案:A

  • 第5题:

    A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS.  Which of the following must be completed prior to this migration ()

    • A、Upgrade system firmware to latest level
    • B、Upgrade to AIX 5.3
    • C、Upgrade HMC to version 6.1
    • D、Convert rootvg filesystems to JFS2

    正确答案:B

  • 第6题:

    A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3.  Which of the following installation methods would minimize downtime()

    • A、Migration installation
    • B、Partition Mobility
    • C、alt_disk_install
    • D、update_all smit fastpath and reboot during the next scheduled outage

    正确答案:C

  • 第7题:

    单选题
    A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3.  Which of the following installation methods would minimize downtime()
    A

    Migration installation

    B

    Partition Mobility

    C

    alt_disk_install

    D

    update_all smit fastpath and reboot during the next scheduled outage


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()
    A

    /usr/bin/errmsg System upgraded to AIX 5.2

    B

    /usr/bin/errlog System upgraded to AIX 5.2

    C

    /usr/bin/errupdate System upgraded to AIX 5.2

    D

    /usr/bin/errlogger System upgraded to AIX 5.2


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A System p distribution customer is very concerned about Reliability, Availability and  Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another.  Which of the following would accomplish this()
    A

    System p servers using similar SAN storage

    B

    System p servers must share an HMC

    C

    System p servers must have the same level HMC

    D

    System p servers with VIOS


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    An administrator issued a command to update the firmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()
    A

    The adapter must be taken offline prior to the firmware update.

    B

    The system has not been rebooted since the adapter was added to the LPAR.

    C

    The adapter must be assigned to the service partition prior to updating the firmware.

    D

    The adapter must be dynamically removed from the LPAR prior to updating the firmware.


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory.  The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2.  They will have a short outage window to perform the data migration.  What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()
    A

    Use rsync to synchronize the data across servers.

    B

    Use exportvg and importvg to move the data to the target system.

    C

    Use NFS to copy the data from the source system to the target system.

    D

    Backup the data from the source system and restore to the target system.


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A system administrator completed an upgrade of the maintenance level of their AIX system. Which of the following commands should be run to verify that the operating system is in a consistent state?()
    A

    instfix -i

    B

    lslpp -l

    C

    lppchk -v

    D

    oslevel -r


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory.  The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2.  They will have a short outage window to perform the data migration.  What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()

    • A、Use rsync to synchronize the data across servers.
    • B、Use exportvg and importvg to move the data to the target system.
    • C、Use NFS to copy the data from the source system to the target system.
    • D、Backup the data from the source system and restore to the target system.

    正确答案:B

  • 第14题:

    A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()

    • A、/usr/bin/errmsg "System upgraded to AIX 5.2"
    • B、/usr/bin/errlog "System upgraded to AIX 5.2"
    • C、/usr/bin/errupdate "System upgraded to AIX 5.2"
    • D、/usr/bin/errlogger "System upgraded to AIX 5.2"

    正确答案:D

  • 第15题:

    A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future.  Which pSeries system would be positioned best to meet this customer’s requirements?()

    • A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2
    • B、p5-550 with the POWER5 processor technology and AIX 5.2
    • C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3
    • D、p5-570 with the POWER5 processor technology and AIX 5.2

    正确答案:D

  • 第16题:

    A System p distribution customer is very concerned about Reliability, Availability and  Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another.  Which of the following would accomplish this()

    • A、System p servers using similar SAN storage
    • B、System p servers must share an HMC
    • C、System p servers must have the same level HMC
    • D、System p servers with VIOS

    正确答案:B

  • 第17题:

    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

    • A、Order a new HMC to support the p5 system.
    • B、Attach the new p5 system to the existing HMC.
    • C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
    • D、Do nothing.  This system does not require an HMC.

    正确答案:A

  • 第18题:

    A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()

    • A、A public internet connection
    • B、All of the Logical Partitions need to be active
    • C、One partition must be configured with Service Authority
    • D、A local Repository must be configured prior to the update

    正确答案:C

  • 第19题:

    单选题
    Prior to implementing an LPAR system, which of the following needs to be done?()
    A

    A graphics monitor must be attached to the server

    B

    Cluster System Management (CSM) software must be installed

    C

    The LPAR system must have an Hardware Management Console (HMC) connected

    D

    Each LPAR must be configured with a CDROM for operating system installation


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A System p administrator plans to install a new system with AIX 5.3 TL5 using a NIM server.  Which of the following provide post install diagnostics()
    A

    SPOT

    B

    lpp_source

    C

    mksysb

    D

    install CD


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    An administrator issued a command to update thefirmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()
    A

    The adapter must be taken offline prior to the firmware update.

    B

    The system has not been rebooted since the adapter was added to the LPAR.

    C

    The adapter must be assigned to the service partition prior to updating the firmware.

    D

    The adapter must be dynamically removed from the LPAR prior to updating thefirmware.


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()
    A

    A public internet connection

    B

    All of the Logical Partitions need to be active

    C

    One partition must be configured with Service Authority

    D

    A local Repository must be configured prior to the update


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
    A

     Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.

    B

     Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.

    C

     Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.

    D

     Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.


    正确答案: D
    解析: 暂无解析