itgle.com

Which order of steps is followed in carrying out the project?A. Assessment-Prototype-Design-Construction.B. Assessment-Design-Prototype-Construction.C. Design-Assessment-Prototype-Construction.D. Design-Prototype-Assessment-Construction.

题目

Which order of steps is followed in carrying out the project?

A. Assessment-Prototype-Design-Construction.

B. Assessment-Design-Prototype-Construction.

C. Design-Assessment-Prototype-Construction.

D. Design-Prototype-Assessment-Construction.


相似考题
参考答案和解析
正确答案:D
更多“Which order of steps is followed in carrying out the project?A. Assessment-Prototype-Design-Construction.B. Assessment-Design-Prototype-Construction.C. Design-Assessment-Prototype-Construction.D. Design-Prototype-Assessment-Construction.”相关问题
  • 第1题:

    112 Using the data shown in the Special window, Activities P, Q, and T are critical path activities. In order to shorten the time duration of the project, which activity should be "crashed" first?

    A. P

    B. Q

    C. R

    D. S

    E. T


    正确答案:A

  • 第2题:

    __________ refers to activities in which language is used for carrying out meaningful tasks.

    A. Task principle

    B. Skill principle

    C. Communication principle

    D. Meaningfulness principle


    正确答案是:A

  • 第3题:

    Describe a situation where you had to seek out relevant information, define key issues and decide on which steps to take to get the desired results.


    正确答案:

     

    第三,请你描述1种情形,在这种情形中你必须去寻找相关的信息,发现关键的问题并且自己决定依照一些步骤来获得期望的结果。

  • 第4题:

    When carrying out a parallel track search pattern,the course of the search units should normally be which of the following ________.

    A.In the same direction as the anticipated drift

    B.In the opposite direction of the anticipated drift

    C.Perpendicular to the line of anticipated drift

    D.Downwind


    正确答案:A

  • 第5题:

    In order to facilitate configuration and change management, manual or automated tools maybe used. Tools selection should be based on the needs of the( ).

    A. Project manager
    B.CCB.members
    C.Project stakeholders
    D. Project Management Office(PMO)

    答案:C
    解析:
    翻译:为了便于实施配置和变更管理,会使用到一些手工或者自动工具,工具的选择取决于项目干系人的需要。A.项目经理 B.变更委员会成员 C.项目干系人 D.项目管理办公室

  • 第6题:

    Which service component in the implement phase is typically performed prior to the handover of awireless solution to the customer’s operations organization?()

    • A、Systems Integration
    • B、Skill Assessment
    • C、Systems Acceptance Testing
    • D、Wireless Check
    • E、Project Close Out

    正确答案:C

  • 第7题:

    Which three service components are in the operate phase?()

    • A、System Monitoring
    • B、Operations Implementation
    • C、Incident and Problem Management
    • D、Change Management
    • E、Operations Plan
    • F、Project Close Out

    正确答案:A,C,D

  • 第8题:

    Which two steps check out a database connection from the connection pool?()

    • A、DB Get  
    • B、DB Read  
    • C、DB Write  
    • D、DB Release

    正确答案:B,C

  • 第9题:

    A System p administrator needs to replace a failed internal disk in a mirrored rootvg.  Which of thefollowing is one of the steps that would need to be followed()

    • A、Run cfgmgr
    • B、odmdelete CuAt
    • C、exportvg rootvg
    • D、Deallocate LPs from failed disk

    正确答案:A

  • 第10题:

    单选题
    When carrying out a parallel track search pattern,the course of the search units should normally be which of the following().
    A

    In the same direction as the anticipated drift

    B

    In the opposite direction of the anticipated drift

    C

    Perpendicular to the line of anticipated drift

    D

    Downwind


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    An administrator needs to replace a failed internal disk in a mirrored rootvg. Which of the following is one of the steps that must be followed()
    A

    Deallocate rootvg mirror

    B

    Use hot replace manager

    C

    Break rootvg mirror

    D

    Deallocate LPs from failed disk


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Which of the following is the correct order?a. Andi found a dying dog on the topb. Andi climbed up the steep slopec. The Davises brought the dog homed. Andi had much trouble carrying the dog downe. The Davises drove the bull dog to the hospital
    A

    badce

    B

    badec

    C

    abdce

    D

    adbec


    正确答案: C
    解析:
    由原文第二段可知,Andi先登上了陡坡,然后发现了一只奄奄一息的狗。因此b比a先发生。故可先排除C、D项。原文第八段提到“an X-ray showed that the bull dog was badly hurt”,说明Andi全家把狗送入了医院,接下来的一段也指出“brought him home that day”说明Andi全家是先把狗送到医院,然后再将其带回家的。故e比c先发生。故正确的顺序是B项。

  • 第13题:

    --Our education system is totally out of order_________It is not out of order, it is in some of troubles.

    A. Yes, you are right

    B.No problem

    C.I don't think so.


    参考答案:C

  • 第14题:

    which order is an equivalent to “send out head line”?


    正确答案:Pay out/Slack the head line.

  • 第15题:

    Which of the following steps are necessary in order to add a new VLAN to a switched network?()

    A. Create the VLAN.

    B. Name the VLAN.

    C. Configure an IP address for the VLAN.

    D. Add the desired ports to the new VLAN.

    E. Add the VLAN to the VTP domain.


    参考答案:A, B, D

  • 第16题:

    In order to pay out or slack a mooring line which is under strain, you should ______.

    A.sluice the line

    B.surge the line

    C.stopper the line

    D.slip the line


    正确答案:B
    为了松出或放松受力的系泊缆绳,你应放松缆绳。

  • 第17题:

    Tom shut everyone out of the lab ____________ out the physical experiment.

    A.carry
    B.carried
    C.and carry
    D.carrying

    答案:D
    解析:
    考查非谓语动词。由shut可判断,该句子的时态是一般过去时,首先排除A项和C项。 shutout意为“使……不能进入,把……关在外面”。根据语境可知,两个动作同时进行,又因为carryout这个动作是主动发出的.所以用现在分词作状语。故选D。

  • 第18题:

    Which three configuration steps must be completed for a Cisco router in order to enable local AAA login authentication?() (Choose three.)

    • A、Apply the method list to an interface
    • B、Specify the default method list and apply it to the interface
    • C、Enable AAA
    • D、Define a method list

    正确答案:A,C,D

  • 第19题:

    ()is one of functions in logistics, which can deliver goods to customer directly by order in the most economic way.

    • A、Transportation 
    • B、Distribution 
    • C、Sending goods 
    • D、Carrying goods

    正确答案:A

  • 第20题:

    A server is experiencing an undetermined problem. Which of the following steps should the technician take in order to identify whether it is a software or hardware problem?()

    • A、Reseat all main components
    • B、Try to replicate the problem
    • C、Flash the BIOS
    • D、Reinstall the operating system

    正确答案:B

  • 第21题:

    单选题
    In order to pay out or slack a mooring line which is under strain,you should().
    A

    sluice the line

    B

    surge the line

    C

    stopper the line

    D

    slip the line


    正确答案: B
    解析: 暂无解析

  • 第22题:

    问答题
    Practice 4  ● Your manager is keen to improve work efficiency among the staff. He has asked you to introduce to your fellow staff members practices to improve time management.  ● Write the report for your manager, including the following information:  ● the importance of planning work time effectively,  ● practices to improve time management,  ● steps to follow in carrying out the practices.

    正确答案: 【参考范文】
    To: Manager
    From: Will Smith
    Date: Oct.23, 2012
    Subject: Time Management
    Introduction
    I am glad to be tasked with this report on improving the efficiency of our work. I am with you that because of the fact that we do not plan our time well, we are not highly efficient. As a famous saying goes, “Time passes very fast, however, it is fair to everybody, not giving one a second more, and also not giving others one second less. It all depends on how you can make use of it.” As a result, if we can improve our time management skills, we could do our jobs efficiently, punctually, and also easily.
    Recommendations
    There are many means of helping us plan our working time. The best way to realize this is to get every staff to have their daily, weekly, and even monthly work plan. Therefore, it is necessary for us to look at our yearly performance goals, and break it into a monthly plan, i.e, within this month we will need to finish a certain task. People can by themselves decide on which date they would like to work on this. To manage time also means that we will need to handle interruptions. I would propose to our people that we cope with them, but also we need to remember our priorities, our monthly and yearly objective. If they have difficulty balancing them, I recommend that they let you make decisions for them.
    The calendar function of Microsoft Office Inbox can do people a favor to plan their time. They will be suggested to put in calendar their planned job and task so that we can take a look and see whether they are doing it well or not.
    解析: 暂无解析

  • 第23题:

    多选题
    Which two steps check out a database connection from the connection pool?()
    A

    DB Get

    B

    DB Read

    C

    DB Write

    D

    DB Release


    正确答案: C,B
    解析: 暂无解析