With a given load on the cargo hook,the thrust on a cargo boom ______.
A.increases as the angle to the horizontal increases
B.increases as the angle to the horizontal decreases
C.is greatest at an angle of 45° and decreases as the boom is raised or lowered
D.is least at an angle of 45° and increases as the boom is raised or lowered
第1题:
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.
A.winch speed
B.boom strength
C.load radius
D.cable strength
第2题:
Mousing a cargo hook with marline or small line ______.
A.increases the lifting capacity of the hook
B.protects the hook from the sling ring
C.prevents the sling ring from coming out of the hook
D.All of the above
第3题:
The jumbo boom can ().
第4题:
大副告诉装卸工人不要用钩子装袋装货。()
第5题:
货钩()
第6题:
General cargo ships may load and discharge by her own winch.
Bulk carriers may handle cargo by her own derricks.
General cargo ships may load and discharge by her own derricks.
General cargo ships may load and discharge by cranes.
第7题:
winch speed
boom strength
load radius
cable strength
第8题:
increases as the cargo closes the head while hoisting
increases if the cargo runner is doubled up
decreases as the boom is topped to a greater angle
is determined by the thrust stresses on the boom
第9题:
increases as the angle to the horizontal increases
increases as the angle to the horizontal decreases
is greatest at an angle of 45° and decreases as the boom is raised or lowered
is least at an angle of 45° and increases as the boom is raised or lowered
第10题:
increases as the boom's angle to the horizontal increases
is at a maximum when the boom is at a 45° angle to the horizontal
increases as the boom's angle to the horizontal decreases
decreases as the boom's angle to the horizontal decreases
第11题:
lift heavy cargo
load and unload
join ropes together
lift light cargo
第12题:
Guy failures
Topping lift failures
Bending of the boom from compression
Gooseneck failure
第13题:
Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom ________.
A.Cargo whip
B.Gooseneck fitting
C.Spider band
D.Topping lift
第14题:
吊货索()
第15题:
A ()is used for lifting long heavy cargo.
第16题:
cargo hook()
第17题:
above
below
equal to
uncertain
第18题:
calculating the ullage in the cargo tanks
loading ballast by gravity
the loading of new cargo into the slop tank as a procedure to minimize pollution
calculating the ratio of cargo expansion in a cargo tank
第19题:
the cargo fall
The cargo hoisting wire rope
the topping lift
the cargo whip
第20题:
The chief officer told the stevedores not to use hooks to load the deck cargo.
The bosun told the stevedores not to use hooks to load the bagged cargo.
The chief officer told the stevedores not to use hooks to load the bagged cargo.
The bosun told the stevedores not to use hooks to load the deck cargo.
第21题:
increases the lifting capacity of the hook
protects the hook from the sling ring
prevents the sling ring from coming out of the hook
All of the above
第22题:
handing of cargo cases
handing oilskings
sewing canvas
splicing small stuff
第23题:
the slewing motor
the luffing motor
the hoisting motor
none of the above