Oil slick caused by spillage of oil from tanker ship is ______.
A.a drop of oil
B.the emulsion of oil at sea surface
C.the weathered oil
D.the oil floating on the surface of the sea water
第1题:
In case of a ship of less than 400 tons gross tonnage other than an oil tanker whist outside the ______,the Administration shall ensure that it is equipped as far as practicable and reasonable with installations to ensure the storage of oil residues with the requirements of MARPOL 73/78.
A.special area
B.national waters
C.the designated zone
D.the designated channels
第2题:
When discharging oil from an oil tanker the instantaneous rate ______ 60 liters per nautical mile.
A.Should not exceed
B.Must be up to
C.Should exceed
D.Should be about
第3题:
Every oil tanker of 150 GT and above and every other ship of 400 GT and above must now carry on board a ______.
A.MCA
B.MRCC
C.SOSREP
D.MCA
第4题:
the ship is not within a special area
the ship is more than 12 nautical miles from the nearest land
the ship is proceeding en route
the instantaneous rate of discharge of oil content does not exceed 60 liters per nautical mile
第5题:
a drop of oil
the emulsion of oil at sea surface
the weathered oil
the oil floating on the surface of the sea water
第6题:
Visual inspection of the element
the pressure drop cross the filter
high fuel oil tank temperature
increase flow rate from the filter
第7题:
all vessels, regardless of size and commercial application
any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboard
an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or above
an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
第8题:
less than 100 parts per million
more than 100 parts per million
at least 100 parts per million
100 parts per million
第9题:
the tanker is within 50 nautical miles from the nearest land
the tanker is no more than 50 nautical miles from the nearest land
the tanker is more than 50 nautical miles from the nearest land
the tanker is not more than 50 nautical miles from the nearest land
第10题:
carbonization of oils from the combustion chambers
emulsions of lube oil and water
coagulation of unburned fuel below the piston rings
all of the above
第11题:
on
to
at
in
第12题:
special area
national waters
the designated zone
the designated channels
第13题:
Shipboard Oil Pollution Emergency Plan shall be carried on board by ______.
A.Oil tanker of 150 gross tonnage and above
B.Bulk carrier
C.Container vessel
D.Passenger ship
第14题:
Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall ______ the system in accordance with the requirements of that Regulation.
A.operate
B.check
C.install
D.overhaul
第15题:
材料:
Every new crude oil tanker of 20000 tons deadweight and above shall be fitted with a cargo tank cleaning system using crude oil washing.The Administration shall undertake to ensure that the system fully complies with the requirements of MARPOL within one year after the tanker was first engaged in the trade of carrying crude oil or by the end of the third voyage carrying crude oil suitable for crude oil washing,whichever occurs later.Unless such oil tanker carries crude oil which is not suitable for crude oil washing,the oil tanker shall operate the system in accordance with the requirements of that Regulation.
Every existing crude oil tanker of 40000 tons deadweight and above shall be provided with segregated ballast tanks.Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks,operate with a cargo tank cleaning procedure using crude oil washing unless the crude oil tanker is intended to carry crude oil which is not suitable for crude oil washing.
Existing crude oil tankers may,in lieu of being provided with segregated ballast tanks or operating with a cargo tank cleaning procedure using crude oil washing,operate with dedicated clean ballast tanks in accordance with the provision of Regulation 13A of this Annex for the following period:for crude oil tankers of 70 000 tons deadweight and above,until two years after the date of entry into force of the present Convention;and for crude oil tankers of 40000 tons deadweight and above but below 70 000 tons deadweight,until four years after the date of entry into force of the present Convention.
问题:
A new crude oil tanker of 30000 tons deadweight shall ________.
A.be fitted with crude oil washing system
B.operate dedicated clean ballast tanks
C.be fitted with segregated ballast tanks
D.be fitted with washing system other than crude oil washing system
Except________,the existing crude oil tankers may operate with any of the following installations.A.segregated ballast tanks
B.cargo tank cleaning procedure using crude oil washing
C.operate with dedicated clean ballast tanks
D.protection position
The latest date for an existing crude oil tanker of 60000 tons deadweight to install dedicated clean ballast tanks is ________.A.until two years after the date of entry into force of the present Convention
B.until four years after the date of entry into force of the present Convention
C.within one year after the tanker was first engaged in the trade of carrying crude oil
D.by the end of the third voyage carrying crude oil
It is inferred that ________.A.all oil tankers,both the newly built and existing ones,shall be fitted with a cargo tank cleaning system using crude oil washing
B.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with segregated ballast tanks
C.a new crude oil tanker of 20 000 tons deadweight and above may,in lieu of being provided with crude oil washing system,operate with dedicated clean ballast tanks
D.a new crude oil tanker of 20 000 tons deadweight and above shall not be fitted with a cargo tank cleaning system using crude oil washing immediately after her entry in the trade of carrying crude oil
请帮忙给出每个问题的正确答案和分析,谢谢!
第16题:
change from heavy fuel oil to diesel oil for mail engine
pumping oil bilge water
change sea chest form high level one to lower one
test emergency generator
第17题:
visual inspection of the elements
the pressure drop across the filter
high lube oil sump temperature
decrease in oil viscosity from the filter
第18题:
Should not exceed
Must be up to
Should exceed
Should be about
第19题:
all vessels,regardless of size and commercial application
any barge or ship constructed or operated in such a manner that no oil in any form can be carried aboard
an oil tanker of 150 gross tons and above,or other ship of 400 gross tons and above
an oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above
第20题:
as well as
as long as
rather than
other than
第21题:
stop the flow of oil at the main deck manifold
prevent the oil from leaving the shore facility
prevent the oil from siphoning through the pump
None of the above
第22题:
bacteria
moulds
yeasts
seals
第23题:
existing crude oil tanker of 20000 tons deadweight and under
new crude oil tanker of 20000 tons deadweight and under
existing crude oil tanker of 20000 tons deadweight and above
new crude oil tanker of 20000 tons deadweight and above