The S.S. Hollowpoint has a charter party in which the charterer assumes no responsibility for the operation of the vessel but pays stevedoring expenses. What is the name of the charter party? ______.
A.Bareboat
B.Dispatch
C.Voyage
D.Demise
第1题:
If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders ______ liable to pay demurrage or damages for detention,as the case may be.
A.himself
B.the owner
C.him
D.the shipper
第2题:
The importance of the distinction between a charter by demise and a charter party proper ______ that under the former the master is the agent of the Charterer,not of the Shipowner.
A.has
B.have
C.is
D.are
第3题:
If the redelivery of a vessel is delayed by causes ______,hire is payable at the charter rate until redelivery even though the market rate may have gone up or down.
A.for which neither party is responsible
B.for which the owner is responsible
C.for which either party is responsible
D.for which the charterer is responsible
第4题:
The owners of the S.S. Short Haul agree to a charter with the Longsplice Steamship Company. The owners stipulate in the charter party that the regular Master must be employed as the vessel's Master for the entire life of the contract. Which charter has be
A.Bareboat
B.Lease
C.Time
D.Voyage
第5题:
Where the cargo can be loaded in two different ways,one of which is more economical of space than the other,but each of which is a usual method of loading cargo of the relevant type,the Charterer ______ in whichever of these ways he pleases,unless he is expressly forbidden so to do by the charter-party.
A.Has to load
B.Can load
C.Loads
D.Is loaded by
第6题:
the shipper
the owner
the consignor
the consignee
第7题:
complies
entitles
supplies
provides
第8题:
has
have
is
are
第9题:
Bareboat charter party
Voyage charter party
Demise charter party
Time charter party
第10题:
reproduced
repatriated
repudiated
recovered
第11题:
Bareboat
Dispatch
Voyage
Demise
第12题:
the Charterer and the Party
the Charterer and the Shipowner
the Charterer and the Cargoowner
the Charterer and the Shipper
第13题:
The cargo must be loaded within the time stipulated by the charter-party,otherwise the Charterer will have to pay ______.
A.despatch
B.demurrage
C.detention
D.damage
第14题:
The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate ______ for the delay.
A.the shipper
B.the owner
C.the consignor
D.the consignee
第15题:
A vessel has a charter party for one voyage to carry a full load of manganese from Durban,South Africa,to Baltimore,Maryland,at a stipulated rate per ton. Which type of contract is involved? ______.
A.Bareboat charter party
B.Voyage charter party
C.Demise charter party
D.Time charter party
第16题:
The S.S. Microwave has been chartered to the Longline Steamship Company. The Longline Steamship Company agrees to pay all expenses and employ and pay the crew. Which type of contract is involved? ______.
A.Bareboat Charter Party
B.Lease Charter Party
C.Time Charter Party
D.Voyage Charter Party
第17题:
The charterer has completed loading the vessel in 3 days instead of the 5 days agreed to in the charter party.As a result of this,the ______.
A.Shipowner may charge for two laydays
B.Charterer may receive dispatch money
C.Stevedore may collect demurrage
D.Consignee may be required to pay a ceaser fee
第18题:
despatch
demurrage
detention
damage
第19题:
rescind
change
alter
amend
第20题:
for which neither party is responsible
for which the owner is responsible
for which either party is responsible
for which the charterer is responsible
第21题:
Bareboat Charter Party
Lease Charter Party
Time Charter Party
Voyage Charter Party
第22题:
provides
becomes
contains
comes
第23题:
Bareboat
Lease
Time
Voyage