The boom stops are installed on an offshore crane to ______.
A.prevent the boom from being raised too high
B.prevent the boom from swinging
C.support the boom when not in use
D.prevent the boom from being lowered
第1题:
The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.
A.Maximum counter weight required
B.Minimum horsepower required
C.Hoist rope strength
D.Allowable load
第2题:
What is meant by the term“luffing the boom”of a crane ________.
A.Stopping the boom
B.Topping or lowering the boom
C.Moving the boom left or right
D.All of the above
第3题:
awkward cargo
drummed cargo
cased cargo
heavy cargo
第4题:
unchanged
increased
eliminated
decreased
第5题:
winch speed
boom strength
load radius
cable strength
第6题:
being raised too high
swinging at sea
overloading when not in use
being lowered too low
第7题:
prevent the boom from being raised too high
prevent the boom from swinging
support the boom when not in use
prevent the boom from being lowered
第8题:
maximum counter weight required
minimum horsepower required
hoist rope strength
allowable load
第9题:
breaking a cargo runner
parting guys topping lifts
carrying away a block
overheating the resistors and eventually burning out
第10题:
At a 45° angle
At right angles
4 feet aft of the heel of the boom
Parallel to the boom
第11题:
vertical position
horizontal position
boom stop angle
minimum radius angle
第12题:
boom angle
boom strength
load radius
cable strength
第13题:
What does “evel-luffing” accomplish during crane operations ________.
A.It prevents the load from swinging when the boom level is adjusted
B.Less power is needed when topping the boom with a load on the hook
C.It maintains the height of the load above the deck
D.All of the above
第14题:
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.
A.winch speed
B.boom strength
C.load radius
D.cable strength
第15题:
Normal boom stowage and shutdown operations
Emergency shutdown operation
Removing booms from stowage
All of the above
第16题:
raise the boom
raise the hook
raise the boom and hook
check the boom stop
第17题:
Lowering the boom
Raising the boom
Spotting the boom over the deck
Swinging the boom athwartships
第18题:
Stopping the boom
Topping or lowering the boom
Moving the boom left or right
All of the above
第19题:
winch speed
boom strength
load radius
cable strength
第20题:
horizontal position of the boom
vertical position of the boom
horizontal position of the load being lifted
vertical position of the load being lifted
第21题:
maximum counter weight required
minimum horsepower required
hoist rope strength
allowable load
第22题:
It prevents the load from swinging when the boom level is adjusted
Less power is needed when topping the boom with a load on the hook
It maintains the height of the load above the deck
All of the above
第23题:
length of the boom
angle of the boom
lifting capacity of the boom
direction of the boom