Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner ________.
A.Two to four feet by the bow
B.Slightly by the bow
C.No trim should be permitted
D.Slightly by the stern
第1题:
A vessel trimmed by the stern has a ______.
A.List
B.Drag
C.Set
D.Sheer
第2题:
While off-loading from an offshore supply vessel with the crane,the wind increases in strength and changes direction significantly,you should ______.
A.Expedite off-loading
B.Stop off-loading,but keep the offshore supply vessel in the present location
C.Continue off-loading with no changes
D.Move the offshore supply vessel to the downwind side
第3题:
翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
第4题:
American Bureau of Shipping
Lloyds of London
National Cargo Bureau
US Salvage
第5题:
Daily
Daily,at sea only
After encountering rough weather
After loading and prior to arrival in port only
第6题:
insure that the hawser leads directly aft as it passes over the stern of the towing vessel
increase the stability of the towing vessel by raising the hawser off the deck
reduce chafing of the towing hawser
prevent fouling of the hawser on deck gear located on the stern of the towing vessel
第7题:
The propeller hub taper and shaft keyway should be inspected for cracks or corrosion
The stern bearing alignment with the stern frame should be checked
The interior of the stern tube should be inspected for leaks
The shaft liner should be removed and inspected
第8题:
Evacuation should be from an area forward of the bridge
The vessel should be slowed to bare steerageway
If the hoist is at the stern,booms extending aft at the stern should be cradled with the topping lifts hove taut
The litter should not be touched until it has been grounded
第9题:
GM-available and required
Longitudinal stress numberal
Tons per inch immersion numeral
Draft
第10题:
to the base of the foremast
to the forward-most bitts
to the forward part of the deckhouse
at the stern
第11题:
Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holds
Turn on ventilation for cargo holds,raise/open the stern door,lower the stern ramp
Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern door
Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds
第12题:
any list,no matter where it is posted,shall be removed prior to ending his watch by the OOW
the vessel should not be removed
any and all lists on board the vessel should be taken off
the inclination of the vessel should be corrected prior to ending his watch by the OOW
第13题:
What should be done after putting down the ramp on a Ro-Ro vessel,prior to loading or discharging cargo ________.
A.Turn on red cargo light
B.Turn on ventilation for cargo holds
C.Call out the deck department for all hands
D.None of the above
第14题:
Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?______.
A.GM – available and required
B.Longitudinal stress numeral
C.Tons per inch immersion numeral
D.Draft
第15题:
list
drag
set
sheer
第16题:
Position all personnel at the stern and rock the vessel upright
Position all personnel around the mast and lift the vessel upright
Lock the centerboard in the down position,stand on the centerboard,and pull on a shroud or a halyard
Put the centerboard in the up position and have all personnel haul in on the line attached to the mast
第17题:
Two to four feet by the bow
Slightly by the bow
No trim should be permitted
Slightly by the stern
第18题:
refer to the vessel's Certificate of Inspection
examine the cargo tanks and fittings
ask the terminal supervisor or his representative
check the loading order
第19题:
Each vessel should show sidelights
Each vessel should show at least one white light
The barges should be lighted as separate units
The barges should be lighted as one vessel
第20题:
GM - available and required
Longitudinal stress numeral
Tons per inch immersion numeral
Draft
第21题:
Frequent stability calculations required
Thorough pre-planning required
Limiting depths alongside berths restrict barge drafts
Minimum trim and 0°list are required for optimum operations
第22题:
comes over the bow
blows the fire back toward the vessel
comes over the stern
comes over either beam
第23题:
shorten the scope of anchor cable
increase the scope of anchor cable
put over the sea anchor
put over a stern anchor