A. The switch port link lights will be off on both switches indicating the ports are not connected.
B. The switch port link light will be off on one switch indicating that STP has disabled the port.
C. The switch port link lights will flash amber indicating an error.
D. The switch port link lights will be green indicating normal operation.
第1题:
A.This switch has more than one interface connected to the root network segment in VLAN 2.
B.This switch is running RSTP while the elected designated switch is running 802.1d Spanning Tree.
C.This switch interface has a higher path cost to the root bridge than another in the topology.
D.This switch has a lower bridge ID for VLAN 2 than the elected designated switch.
第2题:
A technician needs to manage a switch by using the management port on the back of the switch.Which of the following cables would the technician use?()
第3题:
A lightweight access point has been connected to a Catalyst 3550 24-PWR switch, and on power-up the access point fails. What is the problem with the switch?()
第4题:
Hosts on the same VLAN can communicate with each other but are unable to communicate with hosts on different VLANs. What is needed to allow communication between VLANs()。
第5题:
You work as a network Technician. A new workstation has consistently been unable to obtain anIP address from the DHCP server when the workstation boots. Older workstations function normally, and the new workstation obtains an address when manually forced to renew its address. What should be configured on the switch to allow the workstation to obtain an IP address at boot?()
第6题:
An administrator would like to configure a switch over a virtual terminal connection from locations outside of the local LAN. Which of the following are required in order for the switch to be configured from a remote location? ()
第7题:
Which statement is correct about RSTP port roles?()
第8题:
A Cisco Aironet 1020 controller-based access point has been connected to a Catalyst 3550-24 PWRSwitch. However, when it is powered up, the access point fails. What has caused this problem?()
第9题:
The switch port link lights will be off on both switches indicating the ports are not connected.
The switch port link light will be off on one switch indicating that STP has disabled the port.
The switch port link lights will flash amber indicating an error.
The switch port link lights will be green indicating normal operation.
第10题:
An additional switch for the new HMc
Asynchronous adapters on the new HMc
The two 570 servers are directly connected to the new HMc
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
第11题:
by snooping the CoS marking on the incoming frames
by using RTP hello messages between the switch port and the Cisco IP Phone
by using CDP
by using DHCP snooping
by snooping the incoming 802.1Q VLAN tag
第12题:
The switch must be configured with an IP address,subnet mask,and default gateway.
The switch must be connected to a router over a VLAN trunk.
The switch must be reachable through a port connected to its management VLAN.
The switch console port must be connected to the Ethernet LAN.
The switch management VLAN must be created and have a membership of at least one switch port.
The switch must be fully configured as an SNMP agent.
第13题:
A.The Router1 WAN port is configured as a trunking port.
B.The Router1 port connected to Switch1 is configured using subinterfaces.
C.The Router1 port connected to Switch1 is configured as 10 Mbps.
D.The Switch1 port connected to Router1 is configured as a trunking port.
E.The Switch1 port connected to Host B is configured as an access port.
F.The Switch1 port connected to Hub1 is configured as full duplex.
第14题:
When you enter the interface command auto qos voip cisco-phone on a port at the edge of a network,how does the Cisco Catalyst switch detect if a Cisco IP Phone is connected to the port?()
第15题:
A new Catalyst switch is connected to an existing switch using a crossover cable. As a result of this, what would the switch port link lights display?()
第16题:
Which interface commands would you enter on a Catalyst 2900 switch, if your goal was to bring all VLAN traffic to another directly connected switch?()
第17题:
A cisco aironet 1020 controller-based access point has been connected to a catalyst 3550-24 pwr switch. however, when it is powered up, the access point fails. What has caused this problem?()
第18题:
An administrator would like to configure a switch over a virtual terminal connection from locations outside of the local LAN. Which of the following are required in order for the switch to be configured from a remote location? ()
第19题:
A Cisco Aironet 1020 controller-based access point has been connected to a Catalyst 3550-24PWR Switch. However, when it is powered up, the access point fails. What has caused this problem?()
第20题:
When configuring port security on a Cisco Catalyst switch port, what is the default action taken by the switch if a violation occurs? ()
第21题:
a switch with a trunk link that is configured between the switches
a router with an IP address on the physical interface that is connected to the switch
a switch with an access link that is configured between the switches
a router with subinterfaces configured on the physical interface that is connected to the switch
第22题:
The power supply has inadequate wattage.
Power is incorrectly configured on the port.
It does not support 802.3af Poe.
Power is not enabled on the port.
第23题:
An additional switch for the new HMC
Asynchronous adapters on the new HMC
The two 570 servers are directly connected to the new HMC
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
第24题:
The switch must be configured with an IP address, subnet mask, and default gateway.
The switch must be connected to a router over a VLAN trunk.
The switch must be reachable through a port connected to its management VLAN.
The switch console port must be connected to the Ethernet LAN.
The switch management VLAN must be created and have a membership of at least one switch