itgle.com

()describes the configurable items of the project and identifies itcms that will be recorded and updated so that the product of the project tins consistent and operable A.The configuration management plan B.The change management plan C.The requirements tr

题目
()describes the configurable items of the project and identifies itcms that will be recorded and updated so that the product of the project tins consistent and operable
A.The configuration management plan
B.The change management plan
C.The requirements traceability matrix
D.The change baseline


相似考题
更多“()describes the configurable items of the project and identifies itcms that will be recorded and updated so that the product of the project tins consistent and operable ”相关问题
  • 第1题:

    ● A calendar that identifies when a project may be performed on an activity is called a:

    A Project calendar.

    B Resource calendar.

    C Milestone point.

    D Key point.

    E Work unit.


    正确答案:A

  • 第2题:

    ●(74) describes, in detail, the project' s deliverables and the work required to create those deliverables.

    (74) A. Product scope description

    B. Project objectives

    C. Product specification

    D. The project scope statement


    正确答案:D

  • 第3题:

    ______describes,in detail,the project's deliverables and the work required to create those deliverables.

    A.Product scope description

    B.Project objectives

    C.Stakeholder Analysis

    D.The project scope statement


    正确答案:D
    解析:项目范围说明书详细描述项目的可交付成果和为了提交这些可交付成果而必须开展的工作。
    选项A是产品范围说明书,选项B是项目目标,选项C是干系人分析,选项D是项目范围说明书。故D是正确的。

  • 第4题:

    Project Quality Management processes include all the activities of the (75) that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was undertaken.

    A.performing organization

    B.project management team

    C.project

    D.customer


    正确答案:A

  • 第5题:

    Plan Quality is the process of identifying quality requirements and standards for the project and product and documenting how the project will demonstrate compliance ______ is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement and failing to meet requirements.

    A.Cost-Benefit analysis

    B.Control charts

    C.Quality function deployment

    D.Cost of quality analysis


    正确答案:D

  • 第6题:

    The ()describes, in detail, the project’s deliverables and the work required to create those deliverables.

    A.project scope statement
    B.project requirement
    C.project charter
    D.product specification

    答案:A
    解析:
    项目范围说明书详细描述了项目的可交付物以及为创建这些可交付物所需的工作。
    A.项目范围说明书B.项目需求C.项目章程 D.产品规范

  • 第7题:

    The project workbook is not so much a separate document as it is a structure imposed on the documents that the project will be producing anyway.All the documents of the project need to be part of this ( ). This includes objectives ,external specifications , interface specifications , technical standards , internal specifications and administrative memoranda(备忘录).Technical prose is almost immortal. If one examines the genealogy ( Ff ) of a customer manual for a piece of hardware or software , one can trace not only the ideas , but also many of the very sentences and paragraphs back to the first ( ) proposing the product or explaining the first design. For the technical writer, the paste-pot is as mighty as the pen.Since this is so, and since tomorrow's product-quality manuals will grow from today’s memos, it is very important to get the structure of the documentation right. The early design of the project ( ) ensures that the documentation structure itself is crafted, not haphazard. Moreover, the establishment of a structure molds later writing into segments that fit into that structure.The second reason for the project workbook is control of the distribution of (请作答此空). The problem is not to restrict information, but to ensure that relevant information gets to all the people who need it.The first step is to number all memoranda, so that ordered lists of titles are available and h worker can see if he has what he wants. The organization of the workbook goes well beyond this to establish a tree-structure of memoranda. The ( ) allows distribution lists to be maintained by subtree, if that is desirable.

    A. PRODUCT
    B. MANUAL
    C. DOCUMENT
    D. INFORMATION

    答案:D
    解析:
    翻译: 项目工作手册与其说是一个独立的文档,倒不如说它是一种加在文档上的( ),项目会按照项目工作手册来实施。项目所有的文档都是项目工作手册的一部分,其中包括目标、外部说明、接口说明、技术标准、内部说明、以及管理备忘录。技术文档是其中至关重要的部分。如果客户通过用户手册去搜寻硬件或软件的信息,他不止能找到简单的描述还能找到关于项目计划与初步设计方面的( )。对于技术文档工程师来说糊锅跟笔一样重要。鉴于项目质量手册出自出自于这些备忘录,那么建立正确的文档结构尤为重要。早期的项目( )可以确保文档的结构被精心制作而不是被粗制滥造。更进一步说文档结构的建立也给后续的书写工作提供一个模板。再者,项目工作手册也能控制(请作答此空)的分发,它不是严格限制分发而是把信息传递给需要它的人。第一步要给所有备忘录进行编号,形成一个列表,工作手册再把这些备忘录建立一个树形结构。如有必要则在此( )基础上形成分发列表的子结构。A.产品 B.手册 C.文档 D.信息

  • 第8题:

    Requirements management is a ( ) process throughout a project.A requirement is a capability to which a project outcome(product or service)should conform.

    A.persistent
    B.continuing
    C.permanent
    D.continuous

    答案:D
    解析:
    需求管理(持续)贯穿于整个项目过程。需求管理是一种能力,与交付的项目成果(产品或服务)应一致。A.坚持的 B.继续的 C.永久的 D.连续的

  • 第9题:

    Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.

    • A、Project
    • B、project management team
    • C、performingorganization
    • D、customer

    正确答案:C

  • 第10题:

    Project Quality Management must address the management of the project and the()ofthe project. While Project Quality Management applies to all projects,regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.

    • A、performance
    • B、process
    • C、product
    • D、object

    正确答案:C

  • 第11题:

    单选题
    Project Quality Management must address the management of the project and the() of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.
    A

    performance

    B

    process

    C

    product

    D

    object


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    analyzing,tracing,prioritizing and agreeing on requirements and then controlling changes and communicating to relevant stakeholders. It is a()process throughout a project. A requirement is a capability to which a project outcome(product or service)should conform.
    A

    persistent

    B

    continuing

    C

    permanent

    D

    continuous


    正确答案: D
    解析: 暂无解析

  • 第13题:

    ● Project Quality Management must address the management of the projecand the (72) of the project. While Project Quality Management applies to alprojects, regardless of the nature of their product, product quality measureand techniques are specific to the particular type of product produced by thproject.

    A.performance

    B.process

    C.product

    D.object


    正确答案:C

  • 第14题:

    ● (72)describes, in detail, the project’s deliverables and the work required to create those deliverables.

    (72)

    A. Product scope description

    B. Project objectives

    C. Stakeholder Analysis

    D. The project scope statement


    正确答案:D

  • 第15题:

    Project Quality Management must address the management of the project and the ()of the project.While Project Quality Management applies to all projects, regardless of the nature of their product,product quality measures and techniques are specific to the particular type of product produced by the project.()A.performance B.process C.product D.object


    正确答案:C

    项目质量管理必需专注于对项目和项目产品的管理。当所有的项目在运用项目质量管理时,无论项目产品的本质如何,都要依据项目所产生产品的类型明确产品质量的度量和技术。

  • 第16题:

    - Would you please let me know something more about the project -()

    A、OK, I have divided my report into three parts, the first part is an overview of the project.

    B、OK, the project is perfect.

    C、No, the project isn’t so good.


    参考答案:A

  • 第17题:

    The features and functions that characterize a product,service,or result in a project are called( )

    A.statement of workB.product scopeC.product qualityD.project scope


    正确答案:B

  • 第18题:

    ()describees,indetail,the project's deliverables and the work required to create those deliverables.


    A.Product scope description
    B.Project objectives
    C.Produce specification
    D.The project scope statement


    答案:D
    解析:
    项目范围说明书详细描述了项目的可交付物和提供这些可交付物必须要做的工作。

  • 第19题:

    ( ) describes,in detail,the project’s deliverables and the work required to create those deliverables.

    A.Product scope description
    B.Project objectives
    C.Stakeholder Analysis
    D.The project scope statement

    答案:D
    解析:
    项目范围说明书详细描述项目的可交付成果和为了提交这些可交付成果而必须开展的工作。(72) A.产品范围说明书 B.项目目标 C.干系人分析 D.项目范围说明说

  • 第20题:

    ()describes, in detail, the project’s deliverables and the work required to create those deliverables.

    • A、Product scope description
    • B、Project objectives
    • C、Stakeholder Analysis
    • D、The project scope statement

    正确答案:D

  • 第21题:

    The () describes, in detail, the project's deliverables and the work required to create those deliverables.

    • A、project scope statement
    • B、project requirement
    • C、project charter
    • D、product specification

    正确答案:A

  • 第22题:

    What is a reason for reviewing the user requirements document with the client?()

    • A、To gain the client’s acceptance of the detailed design
    • B、To verify mutual understanding of project resources
    • C、To verify mutual understanding of the detailed project plan
    • D、To verify mutual understanding of targeted product performance
    • E、To verify mutual understanding of the tests that will be done after the product is completed

    正确答案:D

  • 第23题:

    单选题
    ()describes, in detail, the project’s deliverables and the work required to create those deliverables.
    A

    Product scope description

    B

    Project objectives

    C

    Stakeholder Analysis

    D

    The project scope statement


    正确答案: A
    解析: 参考答案:D