A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.
A.phases
B.processes
C.segments
D.pieces
第1题:
A、给BIM模型赋予Presentor材质→制定Project计划→将Project文件与BIM模型链接→在Animator中制定关键动画并插入到Timeliner中→设置动画视点并输出施工模拟动画
B、制定Project计划→给BIM模型赋予Presentor材质→将Project文件与BIM模型链接→在Animator中制定关键动画并插入到Timeliner中→设置动画视点并输出施工模拟动画
C、在Animator中制定关键动画并插入到Timeliner中→给BIM模型赋予Presentor材质→制定Project计划→将Project文件与BIM模型链接→设置动画视点并输出施工模拟动画
D、在Animator中制定关键动画并插入到Timeliner中→制定Project计划→给BIM模型赋予Presentor材质→将Project文件与BIM模型链接→设置动画视点并输出施工模拟动画
第2题:
A.http://project-hopE.cydF.gov.cn
B.http://project-hopE.cydF.ac
C.http://project-hopE.cydF.edu.cn
D.http://project-hopE.cydF.com.cn
第3题:
在对原理图进行电气规则检查前,可以()打开规则设置界面。
A.design-Document Options
B.Project-Project Options
C.Tools-Schematic Preferences
D.Project-Configuration Manager
第4题:
Project(29)Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.
A.Integration
B.Time
C.Planning
D.Communication
第5题:
Project(74)Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.
A.Integration
B.Time
C.Planning
D.Communication
第6题:
以下选项中哪个选项是根路径的表达方法?
A.D:/Program Files/.Net/Project1
B./root/.Net/Project1
C../home/.Net/Project1
D.file://D:/Program Files/.Net/Project1