A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the proje

题目

A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.

A.phases

B.processes

C.segments

D.pieces


相似考题
更多“A project life cycle is a collection of generally sequential project (73) whose name and n ”相关问题
  • 第1题:

    Navisworks施工模拟的具体实施步骤是()。

    A、给BIM模型赋予Presentor材质→制定Project计划→将Project文件与BIM模型链接→在Animator中制定关键动画并插入到Timeliner中→设置动画视点并输出施工模拟动画

    B、制定Project计划→给BIM模型赋予Presentor材质→将Project文件与BIM模型链接→在Animator中制定关键动画并插入到Timeliner中→设置动画视点并输出施工模拟动画

    C、在Animator中制定关键动画并插入到Timeliner中→给BIM模型赋予Presentor材质→制定Project计划→将Project文件与BIM模型链接→设置动画视点并输出施工模拟动画

    D、在Animator中制定关键动画并插入到Timeliner中→制定Project计划→给BIM模型赋予Presentor材质→将Project文件与BIM模型链接→设置动画视点并输出施工模拟动画


    答案:A

  • 第2题:

    中国青少年发展基金会在网上的主页地址是()。

    A.http://project-hopE.cydF.gov.cn

    B.http://project-hopE.cydF.ac

    C.http://project-hopE.cydF.edu.cn

    D.http://project-hopE.cydF.com.cn


    参考答案:C

  • 第3题:

    在对原理图进行电气规则检查前,可以()打开规则设置界面。

    A.design-Document Options

    B.Project-Project Options

    C.Tools-Schematic Preferences

    D.Project-Configuration Manager


    Project-Project Options

  • 第4题:

    Project(29)Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.

    A.Integration

    B.Time

    C.Planning

    D.Communication


    正确答案:D
    解析:项目沟通管理是使用所需过程,以确保及时、恰当地产生、收集、分发、存储、收回和最终处置项目信息的知识域。

  • 第5题:

    Project(74)Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.

    A.Integration

    B.Time

    C.Planning

    D.Communication


    正确答案:D
    解析:项目沟通管理是使用所需过程以确保及时、恰当地产生、收集、分发、存储、收回和最终处置项目信息的知识域。

  • 第6题:

    以下选项中哪个选项是根路径的表达方法?

    A.D:/Program Files/.Net/Project1

    B./root/.Net/Project1

    C../home/.Net/Project1

    D.file://D:/Program Files/.Net/Project1


    root/.Net/Project1