根据材料回答3~4题: A project life cycle is a collection of generally sequential project(73)whose name and number are determined by the control needs of the organization or organizations involved in the project.The life cycle provides the basic(74)for managing th

题目

根据材料回答3~4题: A project life cycle is a collection of generally sequential project(73)whose name and number are determined by the control needs of the organization or organizations involved in the project.The life cycle provides the basic(74)for managing the project,regardless ofthe specific work involve D. A.phases B.processes C.segments D.pieces


相似考题
更多“根据材料回答3~4题: A project life cycle is a collection of generally sequential project(7 ”相关问题
  • 第1题:

    以下关于Openstack租户Project说法错误的是()。

    A、一个Project资源集合可供多个用户使用

    B、Project是Openstack各个服务中的一些可以访问的资源集合

    C、网络云各Project采用硬件共享,逻辑隔离的方式

    D、租户是一个有身份验证信息的API实体


    答案:B

  • 第2题:

    中国青少年发展基金会在网上的主页地址是()。

    A.http://project-hopE.cydF.gov.cn

    B.http://project-hopE.cydF.ac

    C.http://project-hopE.cydF.edu.cn

    D.http://project-hopE.cydF.com.cn


    参考答案:C

  • 第3题:

    在对原理图进行电气规则检查前,可以()打开规则设置界面。

    A.design-Document Options

    B.Project-Project Options

    C.Tools-Schematic Preferences

    D.Project-Configuration Manager


    Project-Project Options

  • 第4题:

    Project(29)Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.

    A.Integration

    B.Time

    C.Planning

    D.Communication


    正确答案:D
    解析:项目沟通管理是使用所需过程,以确保及时、恰当地产生、收集、分发、存储、收回和最终处置项目信息的知识域。

  • 第5题:

    Project(74)Management is the Knowledge Area that employs the processes required to ensure timely and appropriate generation, collection, distribution, storage, retrieval, and ultimate disposition of project information.

    A.Integration

    B.Time

    C.Planning

    D.Communication


    正确答案:D
    解析:项目沟通管理是使用所需过程以确保及时、恰当地产生、收集、分发、存储、收回和最终处置项目信息的知识域。