A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this? (Choose all that apply).
A.You must set each end of the trunk line to IEEE 802.1e encapsulation.
B.You must set the same VTP management domain name on both switches.
C.You must set all ports on the two switches as access ports.
D.You must configure one of the switches as a VTP server.
E.You must use a rollover cable to connect the two switches.
第1题:
You need to create a new VLAN on your Catalyst switch. This VLAN is to be named EZONEXAM. Which of the following need to be completed for the creation of this new VLAN? (Select all that apply)
A. The EZONEXAM VLAN must be created.
B. The desired ports must be added to the new EZONEXAM VLAN.
C. The EZONEXAM VLAN must be added to all of the domains.
D. The EZONEXAM VLAN must be named.
E. An IP address must be configured for the EZONEXAM VLAN.
F. None of the above. VLAN creations are automatic.
第2题:
You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()
A. The switch name must match the workgroup name of the local network.
B. The switch must be configured with an IP address and default gateway.
C. The remote workstations must have access to the management VLAN of the switch.
D. CDP must be enabled on the switch so that it can be located by other devices on the network.
第3题:
A. All defined VLANs are allowed on the trunk by default.
B. Each VLAN, or VLAN range, that is specified with the switchport mode command.
C. Each VLAN, or VLAN range, that is specified with the vtp domain command.
D. Each VLAN, or VLAN range, that is specified with the vlan database command.
第4题:
You are using VTP version 2 in your network to transport VLAN information between switches. When adding a switch to the network that has been used in the lab previously, you notice that a lot of the existingVLANs have been deleted or replaced with other names. What can you do to prevent this from happeningin the future, without losing all VTP features that you are using today?()
第5题:
You work as a network technician at Company. Your boss, Mrs. , is interested in switch spoofing. She asks you how an attacker would collect information with VLAN hoping through switch spoofing. You should tell her that the attacking station... ()
第6题:
You have just created a new VLAN on your network. What is one step that you should include in your VLAN based implementation and verification plan? ()
第7题:
You have a trunk link operating between two switches and you’re experiencing problems withframes leaking between the two VLANs. Each switch has identical modules, software revisionsand VLAN configuration information. Spanning tree protocol is disabled on all VLANs. What isprobably causing this problem?()
第8题:
You are planning a new VLAN-based network solution. What is one item you should consider when creating your implementation plan as it concerns VLANs?()
第9题:
What network information do you need when you plan to implement a VLAN-based solution?()
第10题:
You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()
第11题:
You must set each end of the trunk line to IEEE 802.1e encapsulation.
You must set the same VTP management domain name on both switches.
You must set all ports on the two switches as access ports.
You must configure one of the switches as a VTP server.
You must use a rollover cable to connect the two switches.
第12题:
default VLAN information for all unused switch ports
802.1x configuration parameters
number of IP subnets needed
IP routing protocol information
第13题:
The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()
A. The servers have not had VLAN tagging enabled on their NICs.
B. Speed and duplex have not been set.
C. VLAN tagging was not set on the trunk.
D. The servers have been connected with CAT5 cable.
第14题:
A. Two switches are connected via a trunk. Both switches have been assigned an IP address, subnet mask, and default gateway. A ping is successful between the two switches. However, VLAN information is not passed from one switch to the other switch.
B. A router and a switch have been assigned an IP address, a subnet mask, and a default gateway. They are directly connected, but a ping between the two devices fails.
C. A router connects to another router through a serial interface. Both routers have been assigned an IP address, subnet mask, and default gateway. The routers are running RIP and the networks directly connected to the first router do not pass to the second router. However, a ping from one router to the serial interface of the directly connected neighboring router is successful.
D. A router connects to another router via a switch. Both routers and the switch have been assigned an IP address, subnet mask, and default gateway. Neither the routers nor the switch are able to ping one of the hosts that is directly to the switch.
第15题:
A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.Which of the following must you do to accomplish this?()
A. You must set each end of the trunk line to IEEE 802.1e encapsulation.
B. You must set the same VTP management domain name on both switches.
C. You must set all ports on the two switches as access ports.
D. You must configure one of the switches as a VTP server.
E. You must use a rollover cable to connect the two switches.
第16题:
You have just created a new VLAN on your network for inter-VLAN routing. What is one step that you should include in your VLAN-based implementation and verification plan?()
第17题:
You have configured a Cisco Catalyst switch to perform Layer 3 routing via an SVI and have assigned that interface to VLAN 20. To check the status of the SVI, you issue the show interfaces vlan 20 command at the CLI prompt. You see from the output display that the interface is in an "up/up" state. What must be true in an SVI configuration to bring the VLAN and line protocol up?()
第18题:
A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()
第19题:
ISL is being configured on a Company switch. Which of the following choices are true regarding the ISL protocol? ()
第20题:
You have just created a new VLAN on your network. What is one step that you should include in your VLAN-based implementation and verification plan? ()
第21题:
What is the purpose of the cisco Vlan Trunking protocol?()
第22题:
The port must be physically connected to another Layer 3 device.
At least one port in VLAN 20 must be active.
The Layer 3 routing protocol must be operational and receiving routing updates from neighboring peer devices.
Because this is a virtual interface, the operational status will always be in an up/up state.
第23题:
It can be used between Cisco and non-Cisco switch devices.
It calculates a new CRC field on top of the existing CRC field.
It adds 4 bytes of protocol-specific information to the original Ethernet frame.
It adds 30 bytes of protocol-specific information to the original Ethernet frame.