106 Using the situation stated in the Special window, a comparison of the cost schedule of August as compared to July shows that the magnitude ($ value) of the variance has _____ and the percentage change has _____.A. Become worse, become worseB. Become w

题目

106 Using the situation stated in the Special window, a comparison of the cost schedule of August as compared to July shows that the magnitude ($ value) of the variance has _____ and the percentage change has _____.

A. Become worse, become worse

B. Become worse, improved

C. Improved, increased

D. Improved, become worse

E. None of the above are correct


相似考题
更多“106Using the situation stated in the Special window, a comparison of the cost schedule of ”相关问题
  • 第1题:

    57 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above.


    正确答案:C

  • 第2题:

    ● Which of the following are types of status reports?

    A document, variance, trend and exception

    B cost, trend, schedule and acquisition

    C cost, schedule, technical performance

    D analysis, cost, performance and schedule

    E All of the above.


    正确答案:C

  • 第3题:

    健康教育计划实施的“SCOPE模 式”中字母“S”所代表的是

    A、Study(研究)

    B、Schedule (时间表)

    C、Solve(解决)

    D、Special(专门的)

    E、Spend(花费)


    参考答案:B

  • 第4题:

    139 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above


    正确答案:C

  • 第5题:

    ● The Work Breakdown Structure (WBS) is the basis for communicating:

    A Project scope, cost control, schedule, quality

    B Project objectives, dependencies, plan, cost control

    C Project scope, schedule, staffing, cost control

    D Project scope, quality, schedule, dependencies

    E Project budget, schedule, risk factors, work assignments.


    正确答案:A

  • 第6题:

    ● Embedded system is (66) special computer system which is scalable on both software and (67). It can satisfy the strict requirement of functionality, (68) , cost, volume, and power consumption of the particular application. With rapid development of (69) design and manufacture, CPUs became cheap. Lots of (70) electronics have mbedded CPU and thus became embedded systems. For example, PDAs, cellphones, point-of-sale devices, VCRs, industrial robot control, or even your toasters can be embedded system.

    (66)A. cost-oriented B. application-oriented C. efficiency-oriented D. consumption-oriented (67)A. program B. application C. kernel D. hardware

    (68)A. variability B. security C. reliability D. responsibility

    (69)A. IC B. manual C. flexible D. emulational

    (70)A. industrial B. military C. consumer D. special


    正确答案:B,D,C,A,C