itgle.com

98 Which of the following tools and techniques can be used to collect information for the project closure reports?A. Customer SurveysB. BrainstormingC. Document and Performance AnalysisD. Lessons LearnedE. All of the above

题目

98 Which of the following tools and techniques can be used to collect information for the project closure reports?

A. Customer Surveys

B. Brainstorming

C. Document and Performance Analysis

D. Lessons Learned

E. All of the above


相似考题
更多“98 Which of the following tools and techniques can be used to collect information for the project closure reports?A. Customer SurveysB. BrainstormingC. Document and Performance AnalysisD. Lessons LearnedE. All of the above”相关问题
  • 第1题:

    A project manager can exchange information with the project team using which media?

    A tactile

    B audio

    C olfactory

    D visual

    E All of the above.


    正确答案:E

  • 第2题:

    By using Project Risk Management techniques, project managers can develop strategies that do all but which of the following:

    A Significantly reduce project risks

    B eliminate project risks

    C provide a rational basis for better decision making

    D identify risks, their impact(s), and any appropriate responses

    E None of the above.


    正确答案:B

  • 第3题:

    108 Project Risk Management is based on which of the following premises:

    A. the future is unknown.

    B. unknowns can result in risks or opportunities.

    C. we cannot control risk events.

    D. project risk impact can be measured and controlled

    E. All of the above


    正确答案:E

  • 第4题:

    155 A project manager can exchange information with the project team using which media?

    A. tactile

    B. audio

    C. olfactory

    D. visual

    E. All of the above


    正确答案:E

  • 第5题:

    84 In which of the following cost estimating techniques are statistics models used:

    A. nonparametric cost estimating

    B. parametric cost estimating

    C. life cycle cost estimating

    D. bottom-up estimating

    E. All of the above.


    正确答案:B

  • 第6题:

    57 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above.


    正确答案:C

  • 第7题:

    139 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above


    正确答案:C

  • 第8题:

    ● Which of the following are types of status reports?

    A document, variance, trend and exception

    B cost, trend, schedule and acquisition

    C cost, schedule, technical performance

    D analysis, cost, performance and schedule

    E All of the above.


    正确答案:C

  • 第9题:

    Which of the following are considered subcomponents of the problem diagnosis step of thetroubleshooting flow?(Choose all that apply.)()

    • A、Eliminate potential causes
    • B、Collect information
    • C、Document causes
    • D、Hypothesize underlying causes
    • E、Verif/ hypothesis
    • F、Examine collected information

    正确答案:A,B,D,E,F

  • 第10题:

    Which of the following protocols can be used to retrieve system and network performance information from a router?()

    • A、LDAP
    • B、IMAP
    • C、TFTP
    • D、SNMP

    正确答案:D

  • 第11题:

    Which of the following methods can be used to detect block corruption?()  

    • A、 ANALYZE operations
    • B、 dbv
    • C、 SQL queries that access the potentially corrupt block
    • D、 RMAN
    • E、 All of the above

    正确答案:E

  • 第12题:

    单选题
    Which of the following performance tools can be used to determine if a system is thrashing?()
    A

     svmon and tprof

    B

     vmtune and schedtune

    C

     ps and schedtune

    D

     vmstat and topas


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Project Risk Management is based on which of the following premises:

    A the future is unknown.

    B unknowns can result in risks or opportunities.

    C we cannot control risk events.

    D project risk impact can be measured and controlled

    E All of the above.


    正确答案:E

  • 第14题:

    59 By using Project Risk Management techniques, project managers can develop strategies that do all but which of the following:

    A. Significantly reduce project risks

    B. eliminate project risks

    C. provide a rational basis for better decision making

    D. identify risks, their impact(s), and any appropriate responses

    E. None of the above


    正确答案:B

  • 第15题:

    145 Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:

    A. The project manager and project office personnel.

    B. The project team and functional managers.

    C. The project sponsor.

    D. All of the above.

    E. A and B only


    正确答案:E

  • 第16题:

    193 Creation of project objectives:

    A. allows for data collection and analysis and progress reporting against which standards of performance can be measured.

    B. is accomplished by selection of measurable variables against which performance can be judged. C. is required before funding of the project by the project sponsor.

    D. all of the above.

    E. A and B only


    正确答案:E

  • 第17题:

    166 In which of the following cost estimating techniques are statistics models used:

    A. nonparametric cost estimating

    B. parametric cost estimating

    C. life cycle cost estimating

    D. bottom-up estimating

    E. All of the above


    正确答案:B

  • 第18题:

    97 The following reports are normally developed during the project closure phase?

    A. Communications Management Plan and Lessons Learned

    B. Records Archive, Closure Report, lessons learned & Formal Acceptance Report

    C. Records Archive, Closure Report, & Specifications Document

    D. Communications Management Plan and Closure report

    E. None of the above


    正确答案:B

  • 第19题:

    180 Which of the following tools and techniques can be used to collect information for the project closure reports?

    A. Customer Surveys

    B. Brainstorming

    C. Document and Performance Analysis

    D. Lessons Learned

    E. All of the above


    正确答案:E

  • 第20题:

    Accelerated analysis approaches emphasize the construction of( )to more rapidly identify business and user requirements for a new system. As an accelerated analysis technology,( )reads the program code and automatically generates the equivalent system model, and the code can be obtained from ( ). All system analysis approaches require some form of(请作答此空)which includes those techniques to be used to identify or extract system problems and solution requirements from user community. ( )is a classical set of techniques used to collect information about system problems, opportunities, solution requirements, and priorities.



    A. requirement discovery
    B. business process redesign
    C. cause-and-effect analysis
    D. total quality management

    答案:A
    解析:

  • 第21题:

    which one of the following best where layer can be used?()

    • A、form 
    • B、page 
    • C、subform 
    • D、all of the above

    正确答案:B

  • 第22题:

    Which of the following performance tools can be used to determine if a system is thrashing?()

    • A、 svmon and tprof
    • B、 vmtune and schedtune
    • C、 ps and schedtune
    • D、 vmstat and topas

    正确答案:D

  • 第23题:

    A user reports their laptop computer can no longer connect to a server. The computer works correctly in a different office. Which of the following tools would be used to troubleshoot this issue?()

    • A、Cable tester
    • B、Multimeter
    • C、Fiber splicer
    • D、Loopback plug

    正确答案:A