itgle.com

Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.APreliminary planning, detail planning, closeoutBImplementation, reporting, terminationCDev

题目

Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.

APreliminary planning, detail planning, closeout

BImplementation, reporting, termination

CDevelopment, implementation, termination

DExecution, reporting, finishing

EImplementation, termination, post-audit review


相似考题
更多“Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.APreliminary planning, detail planning, closeoutBImplementation, reporting, terminationCDev”相关问题
  • 第1题:

    A comprehensive definition of scope management would be:

    A.Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.

    B.Approval of the scope baseline.

    C.Approval of the detailed project charter.

    D.Configuration control.

    E.Approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.


    正确答案:A
    A

  • 第2题:

    121 Project management/project planning is most closely aligned with:

    A. Long range/strategic planning (5 years or more).

    B. Intermediate range planning (1 to 5 years)

    C. Short range/tactical planning (1 year or less).

    D. All of the above.

    E. B and C


    正确答案:E

  • 第3题:

    4 Team members want to work for a project manager that can provide them with career path planning. In which organizational form. is career path planning difficult for project employees?

    A. Matrix

    B Pure project

    C. Project coordinator

    D. Project expediter

    E. Classical/traditional


    正确答案:B

  • 第4题:

    86 Team members want to work for a project manager that can provide them with career path planning. In which organizational form. is career path planning difficult for project employees?

    A. Matrix

    B. Pure project

    C. Project coordinator

    D. Project expediter

    E. Classical/traditional


    正确答案:B

  • 第5题:

    ● A summary WBS is usually developed in the

    A Conceptual phase

    B implementation phase

    C planning phase

    D close-out phase

    E All of the above phases


    正确答案:A

  • 第6题:

    ● A comprehensive definition of scope management would be:

    A Managing a project in terms of its objective through the concept, development, implementation, and termination phases of a project.

    B Approval of the scope baseline.

    C Approval of the detailed project charter.

    D Configuration control.

    E Approved detailed planning including budgets, resource allocation, linear responsibility charts and management sponsorship.


    正确答案:A

  • 第7题:

    ● The project life-cycle can be described as(72).

    (72)

    A.project concept, project planning, project execution, and project close-out

    B.project planning, work authorization, and project reporting

    C.project planning, project control, project definition, WBS development, and project termination

    D.project concept, project execution, and project reporting


    正确答案:A

    试题(72)分析
      关于项目周期划分正确的是  (72)  。
      A.启动、计划、执行、收尾
      B.计划、授权、报告
      C.计划、控制、方案设计、WBS的发展、终止
      D.启动、执行、报告
    参考答案
      (72)A

  • 第8题:

    The project life-cycle can be described as(72). A.project concept,project plannin9,project execution,and project close-out B.project planning,work authorization,and project reporting C.project planning,project control,project definition,WBS development,and project termination D.project concept,project execution,and project reporting


    正确答案:A
    项目的生命周期可以被描述为项目启动、项目计划,项目实施和项目收尾。

  • 第9题:

    The project life-cycle can be described as().

    A.project concept, project planning, project execution, and project close-out
    B.project planning, work authorization, and project reporting
    C.project planning, project control, project definition, WBS development, and project termination
    D.project concept, project execution, and project reporting

    答案:A
    解析:
    关于项目周期划分正确的是(72)。

    A. 启动、计划、执行、收尾

    B. 计划、授权、报告

    C. 计划、控制、方案设计、WBS的发展、终止

    D. 启动、执行、报告

  • 第10题:

    The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is( ).

    A.development
    B.concept
    C.system analysis
    D.implementation

    答案:B
    解析:
    翻译:项目的生命周期是对项目各个阶段从开始到结束的描述。下列哪项不是一个阶段的传统项目的生命周期,它是概念阶段。A.开发 B.概念 C.系统分析 D.实施

  • 第11题:

    Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。

    • A、initiation planning analysis design development implementation operations and maintenance
    • B、project planning, site assessment risk assessment solution selection and acquisition, testing, and operations
    • C、prepare, plan, design, implement operate, and optimize
    • D、analysis, design, deployment testing, implementation, and production
    • E、presales, project planning, development implementation, operations testing, and operations sign- off

    正确答案:C

  • 第12题:

    单选题
    Which of these is an accurate list of Cisco Lifecycle Services phases? Select exactly 1 answer(s) from the following:()。
    A

    initiation planning analysis design development implementation operations and maintenance

    B

    project planning, site assessment risk assessment solution selection and acquisition, testing, and operations

    C

    prepare, plan, design, implement operate, and optimize

    D

    analysis, design, deployment testing, implementation, and production

    E

    presales, project planning, development implementation, operations testing, and operations sign- off


    正确答案: D
    解析: 暂无解析

  • 第13题:

    Team members want to work for a project manager that can provide them with career path planning. In which organizational form. is career path planning difficult for project employees?

    A . Matrix

    B . Pure project

    C . Project coordinator

    D . Project expediter

    E . Classical/traditional


    正确答案:B

  • 第14题:

    167 The project life-cycle can be described as:

    A. project concept, project planning, project execution, and project close-out.

    B. project planning, work authorization, and project reporting.

    C. project planning, project control, project definition, WBS development, and project termination. D. project concept, project execution, and project reporting.

    E. All of the above


    正确答案:A

  • 第15题:

    92 Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.

    A. Preliminary planning, detail planning, closeout

    B. Implementation, reporting, termination

    C. Development, implementation, termination

    D. Execution, reporting, finishing

    E. Implementation, termination, post-audit review


    正确答案:C

  • 第16题:

    82 Which of the following are included in the Acquisition phase(s) of the project life cycle.

    A. concept and development

    B. development and planning

    C. execution and phase-out

    D. planning and implementation

    E. concept and planning


    正确答案:C

  • 第17题:

    ● Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.

    A Preliminary planning, detail planning, closeout

    B Implementation, reporting, termination

    C Development, implementation, termination

    D Execution, reporting, finishing

    E Implementation, termination, post-audit review


    正确答案:C

  • 第18题:

    Most system development methodologies also provide (71), whose purpose is to contain the various pieces of relevant information-feasibility assessments, schedules, needs analysis, and so forth-in a single place so that they can be presented to project clients and other related parties.

    A.statement of work

    B.project planning

    C.baseline plan

    D.information system planning


    正确答案:C

  • 第19题:

    The(67)defines the phases that connect the beginning of a project to its end.

    A.schedule

    B.project life cycle

    C.temporary

    D.milestone


    正确答案:B
    解析:项目生命周期定义了从项目开始直至结束的项目阶段。

  • 第20题:

    The (71) defines the phases that connect the beginning of a project to its end.

    A.milestone

    B.schedule

    C.temporary

    D.project life cycle


    正确答案:D

  • 第21题:

    There are four phases in the life cycle of a project:start,plan,execute and( ).

    A.implement
    B.performance
    C.end
    D.excute

    答案:C
    解析:
    项目的生命周期有四个阶段为启动、计划、执行与结束。A执行B执行C结束D执行

  • 第22题:

    The life cycle of aproject is a description of the various phases of the project from thebeginning to the end. One of the followings is not a phase of the traditionalproject life cycle, It is( ).

    A.development
    B.concept
    C.system analysis
    D.implementation

    答案:B
    解析:

  • 第23题:

    The() defines the phases that connect the beginning of a project to its end.

    • A、schedule
    • B、project life cycle
    • C、temporary
    • D、milestone

    正确答案:D