The project charter:
A.Expresses upper management commitment to the project.
B.Provides that authority by which the project will be run.
C.Establishes that organizational structure with the project.
D.Specifies overall objectives and timeframe. of the project.
E.All of the above.
第1题:
● The identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives are indentified in the _____ phase of the project but first documented in the project _____.
A Conceptual, charter/baseline.
B Conceptual, master schedule.
C Development, charter/baseline.
D Development, master schedule.
E Development, masterplan.
第2题:
Which of the following qualities or abilities is related to reliability, professionalism or work ethics?
A.Time management.
B.Flexibility.
C.Commitment.
D.Team play.
第3题:
A. All VLANs except the default VLAN will be removed from all switches.
B. All existing switches will have the students, admin, faculty, Servers, Management,Production, and no-where VLANs.
C. The VLANs Servers, Management, Production, and no-where will replace the VLANs on SwX.
D. The VLANs Servers, Management, Production, and no-where will be removed from existing switches.
第4题:
A、dragging
B、assembled
C、glimpse
D、commitment
第5题:
Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.
A.Integration
B.Configuration
C.Scope
D.Requirement
第6题:
设 str = 'python' ,想把字符串的第一个字母大写,其他字母还是小写,正确的选项是()
A.print(str[0].upper()+str[1:])
B.print(str[1].upper()+str[-1:1])
C.print(str[0].upper()+str[1:-1])
D.print(str[1].upper()+str[2:])