itgle.com

Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:A.The project manager and project office personnel.B.The project team and functional managers.C.The project sponsor.D.All of the above.E.A and B only.

题目

Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:

A.The project manager and project office personnel.

B.The project team and functional managers.

C.The project sponsor.

D.All of the above.

E.A and B only.


相似考题
更多“Scheduling systems such as PERT, ADM, and PDM are project management tools to be used by:A ”相关问题
  • 第1题:

    计划系统,如PERT、ADM和PDM,是由( )使用的项目管理工具。

    A项目负责人

    B以上皆是

    C项目组织

    D项目负责人和项目管理团队人员


    参考答案:D 

  • 第2题:

    AcustomerhasasystemwithanumberofLPARs,oneofwhichisrunningasupportedversionofLinux.WhichCLIcommandcananadministratorusetodisplaytheCPUandmemoryresourceallocationoftheLinuxpartition?()

    A.cat/proc/usr/lparchk

    B.cat/proc/ppc64/lparcfg

    C./var/adm/tools/res_list

    D./var/adm/tools/lparalloc


    参考答案:B

  • 第3题:

    在对原理图进行电气规则检查前,可以()打开规则设置界面。

    A.design-Document Options

    B.Project-Project Options

    C.Tools-Schematic Preferences

    D.Project-Configuration Manager


    Project-Project Options

  • 第4题:

    Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.

    A.Integration

    B.Configuration

    C.Scope

    D.Requirement


    正确答案:C

  • 第5题:

    下列对网络图描述正确的是()

    A.PDM图能够表示多种活动逻辑关系,而ADM图不能

    B.ADM图中的虚活动消耗资源和时间

    C.PDM图中可能有多个开始和多个结束

    D.ADM图用单节点表示活动本身


    PDM 图相较于ADM图,能够表示更多种的活动逻辑关系

  • 第6题:

    在原理图界面将鼠标光标设置为large cursor 90应选择()。

    A.Project-Project Options..

    B.Project-Project Templates...

    C.Tools-Schematic Preferencs...

    D.Design-Document Options...


    Tools-Schematic Preferencs...