Non-conformance penalties are a form. of _____.
A . quality incentive
B . risk sharing
C . contract negotiations
D . quality assurance programs
E . None of the above.
第1题:
Quality control is normally performed by the _____ .
A . QA personnel
B . project team
C . operating personnel
D . project management
E . None of the above.
第2题:
Inspection of a complex project according to specifications is accomplished by _____.
A . inspection by attributes.
B . cyclical inspection
C . quality conformance inspection
D . original inspection
E . None of the above.
第3题:
The Risk of NOT meeting project quality objectives:
A . can be minimized through continuous monitoring.
B . considered a long term risk.
C . will be reflected in the "in-service" life of the product or service.
D . B and C
E . All of the above.
第4题:
The Quality Risk _____ .
A is minimized through continuous monitoring.
B is considered a long term risk.
C will be reflected in the in-service life of the project result.
D B and C
E All of the above.
第5题:
100 The auditing function that provides feedback about the quality of output is referred to as:
A. quality control.
B. quality planning.
C. quality assurance.
D. quality improvement
E. All of the above
第6题:
69 Non-conformance penalties are a form. of _____.
A. quality incentive
B. risk sharing
C. contract negotiations
D. quality assurance programs
E. None of the above
第7题:
● Project tradeoffs are usually made by comparing _____ and constraints.
A Time, cost, and quality
B Time, risk, and quality
C Risk, quality, and manpower availability
D Cost, quality, and technical performance
E Cost, quality, and risk
第8题:
● (73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.
(73)
A. Quality assurance (QA)
B. Quality planning
C. Quality control (QC)
D. Quality costs
第9题:
Which of the following is not part of the quality assurance process?(73)
A.Operational definitions
B.Quality policy
C.Quality audits
D.Quality improvement
第10题:
● Which of the following is not part of the quality assurance process?(73)
(73)
A.Operational definitions
B.Quality policy
C.Quality audits
D.Quality improvement
第11题:
第12题:
第13题:
Quality and _____ are directly related.
A . productivity
B . cost overruns
C . scope control
D . Pareto diagram
E . None of the above.
第14题:
The best way to insure quality conformance is to _____.
A . distribute the responsibility to subordinates.
B . maintain total control.
C . train each worker to implement the work.
D . inspect quality into the project.
E . None of the above.
第15题:
The auditing function that provides feedback about the quality of output is referred to as:
A . quality control.
B . quality planning.
C . quality assurance.
D . quality improvement
E . All of the above.
第16题:
In Project Risk Management, Risk Response may include actions to:
A reduce the probability of risk events
B change the scope, budget, schedule or quality specifications of the project
C reduce the consequences or severity of impacts of a potential risk event
D A and C
E All of the above.
第17题:
39 Quality and _____ are directly related.
A. productivity
B. cost overruns
C. scope control
D. Pareto diagram
E. None of the above.
第18题:
72 Project trade-offs vary between
A. risk, cost and schedule.
B. direct cost, indirect cost, and resource availability
C. quality, schedule and time
D. cost, quality and schedule
E. contract terms, scope and budget
第19题:
● Proper implementation of project management will guarantee that:
A Budgets will be met.
B Schedules will be adhered to.
C Quality/performance will be met.
D The project will be a success.
E None of the above.
第20题:
● ()is the application ion of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.()A. Quality assurance (QA) B. Quality planningC. Quality control (QC) D. Quality costs
第21题:
Quality management ensures that an organization , It has foor main components; quality planning,quality assurance. Quality control and quality ( )
A.improvement
B.change
C.spiral
D.evolution
正确答案:A
第22题:
第23题: