The scope statement provides
A . A basis for future decisions about a project.
B . A baseline to accomplish verification measures.
C . A baseline to evaluate potential scope changes.
D . All of the above
E . B and C only
第1题:
● The identification, definition, and selection of the project objectives as well as the best approach to achieving the project objectives are indentified in the _____ phase of the project but first documented in the project _____.
A Conceptual, charter/baseline.
B Conceptual, master schedule.
C Development, charter/baseline.
D Development, master schedule.
E Development, masterplan.
第2题:
A.prospective
B.prospect
C.futuristic
D.future
第3题:
future __________ 子孙后代
第4题:
35______
A. health
B. safety
C.joy
D. future
第5题:
Small molecules hold the ____ for convenient diabetes treatment.
A: profits
B: promise
C: wish
D: future
第6题:
p__________ future 光明的前途