itgle.com

单选题When should Solutions Assurance Reviews take place?()A Pre-order, pre-installationB Post-order, pre-installationC Pre-order, post completion sign-offD Pre-installation, post completion sign-off

题目
单选题
When should Solutions Assurance Reviews take place?()
A

Pre-order, pre-installation

B

Post-order, pre-installation

C

Pre-order, post completion sign-off

D

Pre-installation, post completion sign-off


相似考题
更多“单选题When should Solutions Assurance Reviews take place?()A Pre-order, pre-installationB Post-order, pre-installationC Pre-order, post completion sign-offD Pre-installation, post completion sign-off”相关问题
  • 第1题:

    which activity belongs to post-listening activities? ()

    A. Dictogloss

    B. Predicting

    C. Listen and take notes

    D. Listen and tick


    正确答案是:A

  • 第2题:

    which activity belongs to post-listening activities______.

    A、Predicting

    B、Listen and tick

    C、Listen and take notes

    D、Dictogloss


    参考答案:D

  • 第3题:

    Which of the following activities actually does not involve writing?

    A.Completion according to outlines.
    B.Completion with multiple choices.
    C.Completion according to topic sentences.
    D.Completion according to the brainstorming.

    答案:B
    解析:
    考查写作技能教学。写作是一个从输入到输出的过程,因此要特别注意写前的输入。写作前进行的思路整理、素材组织、结构规划、大纲提炼、头脑风暴,写作中进行的遣词造句,以及写作后涉及的修改润色、检查校对都是写作活动中必不可少的环节。因此A、C、D三项都涉及写作,B项不涉及。
    名师如何巧解题?查看视频解析>>

  • 第4题:

    The auto-complete feature in the JUNOS CLI is triggered by which method?()

    • A、space bar for both command and variable completion
    • B、space bar for command completion;tab key for variable completion
    • C、space bar for variable completion;tab key for command completion
    • D、tab key for variable and command completion;space bar for command completion

    正确答案:D

  • 第5题:

    When should Solutions Assurance Reviews take place?()

    • A、Pre-order, pre-installation
    • B、Post-order, pre-installation
    • C、Pre-order, post completion sign-off
    • D、Pre-installation, post completion sign-off

    正确答案:A

  • 第6题:

    单选题
    The auto-complete feature in the JUNOS CLI is triggered by which method?()
    A

    space bar for both command and variable completion

    B

    space bar for command completion;tab key for variable completion

    C

    space bar for variable completion;tab key for command completion

    D

    tab key for variable and command completion;space bar for command completion


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    When should Solutions Assurance Reviews take place?()
    A

    Pre-order, pre-installation

    B

    Post-order, pre-installation

    C

    Pre-order, post completion sign-off

    D

    Pre-installation, post completion sign-off


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    You create an intranet Web site for management of project documents. You need to enable all users to browse documents on the site. Only members of the administrators group must be able to upload files. Which code segment of the Web.config file should you use? ()
    A

    <allow verbs=GET users=* /><deny verbs=POST users=* /><allow verbs=POST roles=Administrators />

    B

    <allow roles=Administrators /><deny users=* />

    C

    <allow u sers=Administrators /><allow users=* />

    D

    <allow v erbs = POST roles=Administrators /><deny verbs=POST users=* /><allow verbs=GET users=* />


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    The mksysb command completed successfully. Which of the following steps are necessary to verify the mksysb is good?()
    A

    Store the mksysb in a safe place because a successful completion guarantees the mksysb is good.

    B

    Boot from the mksysb to verify it is bootable and list the files on the mksysb.

    C

    Look at the bosboot output when the mksysb was created to verify it is good.

    D

    List the files on the mksysb beucase listing all the files verifies there are no problems with the mksysb.


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    Where did this conversation take place?
    A

    At a bakery.

    B

    At a friend’s home.

    C

    At a post office.


    正确答案: B
    解析: 从对话的第一句:要买饼干和生日蛋糕就可以猜出对话应该发生在面包房。
    【录音原文】
      M: I’d like four rolls, a pound of biscuits and that birthday cake.
      W: Do you want the cake delivered?

  • 第11题:

    多选题
    Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()
    A

    elapsed time since the target start date or completion date of previous work generated by PM

    B

    difference between completion date of previous work and system date is equal to Lead Time

    C

    elapsed time since the target start date or completion date of the latest work orders for the asset

    D

    metered equipment usage since the target start date or completion date of previous work generated by PM

    E

    metered equipment usage since the target start date or completion date of the latest work order for the asset


    正确答案: A,D
    解析: 暂无解析

  • 第12题:

    单选题
    The Smiths _____ their breakfast when the morning post came.
    A

    had

    B

    has been having

    C

    are having

    D

    were having


    正确答案: B
    解析:

  • 第13题:

    Would you tell me ________?

    A、where is the post office

    B、where stands the post office

    C、where the post office is

    D、where stood the post office


    参考答案:C

  • 第14题:

    Upon the completion of required tests, a ____ should be placed on each extinguisher, showing the date and the person who completed the tests.

    A.cap

    B.disc

    C.tag

    D.cover


    正确答案:C

  • 第15题:

    Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()

    • A、 elapsed time since the target start date or completion date of previous work generated by PM  
    • B、 difference between completion date of previous work and system date is equal to Lead Time  
    • C、 elapsed time since the target start date or completion date of the latest work orders for the asset
    • D、 metered equipment usage since the target start date or completion date of previous work generated by PM
    • E、 metered equipment usage since the target start date or completion date of the latest work order for the asset

    正确答案:A,D

  • 第16题:

    读取post方法传递的表单元素值的方法是:()

    • A、$_post["名称"]
    • B、$_POST["名称"]
    • C、$post["名称"]
    • D、$POST["名称"]

    正确答案:B

  • 第17题:

    Which of the following is the correct collection of build events?()

    • A、Pre-Build, Post-Link, and Pre-Link
    • B、Pre-Build, Post-Build, and Post-Link
    • C、Pre-Build, Pre-Link, and Post-Build
    • D、Post-Link, Pre-Link, and Post-Build

    正确答案:C

  • 第18题:

    单选题
    A ship can request completion of a () when the ship is at a higher security level than the port facility or another ship it is interfacing with.
    A

    DOC

    B

    DOS

    C

    SSP

    D

    SMC


    正确答案: B
    解析: 暂无解析

  • 第19题:

    单选题
    management has asked bob to post an introductory welcome page when notes users first open the video application in which one of the following places should bob put the welcome message?()
    A

     in a document named welcome 

    B

     in the  database about doc 

    C

     in the  database using doc 

    D

     in the first page in the database design


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    Fire prevention during welding or burning aboard any vessel should include ().
    A

    posting a fire watch in the immediate area

    B

    providing an extinguisher which is ready for immediate use

    C

    requiring the fire watch to remain on post for 30 minutes after the completion of welding or burning

    D

    All of the above


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    The port clearance for a ship should be granted()the completion of loading or discharging in the port.
    A

    before

    B

    when

    C

    after

    D

    during


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    读取post方法传递的表单元素值的方法是:()
    A

    $_post[名称]

    B

    $_POST[名称]

    C

    $post[名称]

    D

    $POST[名称]


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    Which of the following is the correct collection of build events?()
    A

    Pre-Build, Post-Link, and Pre-Link

    B

    Pre-Build, Post-Build, and Post-Link

    C

    Pre-Build, Pre-Link, and Post-Build

    D

    Post-Link, Pre-Link, and Post-Build


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    Upon the completion of required tests, a () should be placed on each extinguisher, showing the date and the person who completed the tests.
    A

    cap

    B

    disc

    C

    tag

    D

    cover


    正确答案: D
    解析: 暂无解析