What must the Ezonexam network administrator do in order to successfully configure a VLAN trunk between two switches named VE1 and VE2? (Select two answer choices)
A. Set each end of the trunk line to IEEE 802.1Q encapsulation.
B. Set the same VTP management domain name on both switches.
C. Set all ports on the two switched as access ports.
D. Configure one of the two switches as a VTP server.
E. Connect the two switches using a rollover cable.
F. Use a router to forward VTP traffic between the VLANs.
第1题:
The Ezonexam network administrator has issued the "VTP password ezonexam" command on a Cisco device. What is the purpose of this command?
A.It allows two VTP servers to exists in the same domain, each configured with different passwords
B.It is the password required when promoting a switch from VTP client mode to VTP server mode
C.It is used to access the VTP server to make changes to the VTP configuration
D.It is used to validate the sources of VTP advertisements sent between switches
E.None of the above
第2题:
A. Set each end of the trunk line to IEEE 802.1Q encapsulation.
B. Set the same VTP management domain name on both switches.
C. Set all ports on the two switched as access ports.
D. Configure one of the two switches as a VTP server.
E. Connect the two switches using a rollover cable.
F. Use a router to forward VTP traffic between the VLANs.
第3题:
A. Each end of the trunk line must be set to IEEE 802.1E encapsulation.
B. The VTP management domain name of both switches must be set the same.
C. All ports on both the switches must be set as access ports.
D. One of the two switches must be configured as a VTP server.
E. A rollover cable is required to connect the two switches together.
F. A router must be used to forward VTP traffic between VLANs.
第4题:
A.Each end of the trunk line must be set to IEEE 802.1E encapsulation.
B.The VTP management domain name of both switches must be set the same.
C.All ports on both the switches must be set as access ports.
D.One of the two switches must be configured as a VTP server.
E.A rollover cable is required to connect the two switches together.
F.A router must be used to forward VTP traffic between VLANs.
第5题:
You need to investigate a VTP problem between two Company switches. The lack of which two prevents VTP information from propagating between switches?()
第6题:
What must an administrator do in order to successfully configure a VLAN trunk between two switches?()
第7题:
An administrator is configuring a Catalyst switch with VLAN information that must be automatically distributed to other Catalyst switches in the network. What conditions must be met in order for the VLANs configured on this switch to be automatically configured on the other switches?()
第8题:
The network administrator is trying to add Switch1 to the network, but the 802.1Q trunk is not coming up. Switch1 was previously tested in the laboratory and its trunk configuration worked fine. What are three possible causes of this problem? ()
第9题:
If you were to configure an ISL Ethernet trunk between two Cisco switches, named R1 and R2, what would you have to include at the end of the link for the trunk to operate correctly? ()
第10题:
Set each end of the trunk line to IEEE 802.1Q encapsulation.
Set the same VTP management domain name on both switches.
Set all ports on the two switched as access ports.
Configure one of the two switches as a VTP server.
Connect the two switches using a rollover cable.
Use a router to forward VTP traffic between the VLANs.
第11题:
An identical VTP mode.
An identical speed/duplex.
An identical trunk negotiation parameter.
An identical trunk encapsulation parameter.
第12题:
The link is using IEEE 802.1Q protocol
The link is using IEEE 802.1E protocol
Spanning tree is disabled
Not enough information to determine
The native VLAN information is identical at each end of the link
The native VLAN information is different at each end of the link
第13题:
An administrator is configuring a Catalyst switch with VLAN information that must be automatically distributed to other Catalyst switches in the network.What conditions must be met in order for the VLANs configured on this switch to be automatically configured on the other switches?()
A. The switch that will share its VLAN configuration must be in VTP server mode.
B. The switches must be in the same VTP domain.
C. The switch that will share the VLAN information must be configured as the root bridge.
D. The switches must be connected over VLAN trunks.
E. The switches must be configured to use the same STP version.
F. The switches must have VTP pruning activated.
第14题:
A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.Which of the following must you do to accomplish this?()
A. You must set each end of the trunk line to IEEE 802.1e encapsulation.
B. You must set the same VTP management domain name on both switches.
C. You must set all ports on the two switches as access ports.
D. You must configure one of the switches as a VTP server.
E. You must use a rollover cable to connect the two switches.
第15题:
Refer to the exhibit.All switch ports are assigned to the correct VLANs, but none of the hosts connected to SwitchA can communicate with hosts in the same VLAN connected to SwitchB. Based on the output shown, what is the most likely problem?()
A.The access link needs to be configured in multiple VLANs.
B.The link between the switches is configured in the wrong VLAN.
C.The link between the switches needs to be configured as a trunk.
D.VTP is not configured to carry VLAN information between the switches.
E.Switch IP addresses must be configured in order for traffic to be forwarded between the switches
第16题:
he network administrator is trying to add Switch1 to the network, but the 802.1Q trunk is not coming up. Switch1 was previously tested in the laboratory and its trunk configuration worked fine. What are three possible causes of this problem?()
第17题:
You have a trunk link operating between two switches and you’re experiencing problems withframes leaking between the two VLANs. Each switch has identical modules, software revisionsand VLAN configuration information. Spanning tree protocol is disabled on all VLANs. What isprobably causing this problem?()
第18题:
You are troubleshooting a Catalyst 5000 trunk in the network. What should you do if there’s adisagreement about the VLANs configured to use the trunk?()
第19题:
An 802.1Q trunk is not coming up between two switches. The ports on both switches are configured as "switchport mode desirable." Assuming that there is no physical issue, choose two possible causes.()
第20题:
A switch port on TK1 is being configured to support 802.1Q trunking. Which of the following are true about 802.1Q trunking?()
第21题:
A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()
第22题:
Each end of the trunk line must be set to IEEE 802.1E encapsulation.
The VTP management domain name of both switches must be set the same.
All ports on both the switches must be set as access port.
One of the two switches must be configured as a VTP server.
A rollover cable is required to connect the two switches together.
A router must be used to forward VTP traffic between VLANs.
第23题:
The switch that will share its VLAN configuration must be in VTP server mode.
The switches must be in the same VTP domain.
The switch that will share the VLAN information must be configured as the root bridge.
The switches must be connected over VLAN trunks.
The switches must be configured to use the same STP version.
The switches must have VTP pruning activated.