33 Scope reporting is the timely determination, _____, and _____ of project progress, status data, and transforming this into structured documentation (reports) necessary to judge project performance (reporting on work packages).
A. Recording, accumulation.
B. Recording, graphical display.
C. Accumulation, graphical display.
D. Graphical display, interpretation.
E. Interpretation, analysis
第1题:
● Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.
A Preliminary planning, detail planning, closeout
B Implementation, reporting, termination
C Development, implementation, termination
D Execution, reporting, finishing
E Implementation, termination, post-audit review
第2题:
Apart from caring for her children, she has to take on such heavy _____ housework as carrying water and firewood.
A) timeconsumed B) timelyconsumed C) timeconsuming D) timely
C
考查单词:time-consuming 耗时的
第3题:
[A] assessment
[B] decision
[C] determination
[D] assistance
第4题:
A.在分组空闲模式下,NC_REPORTING_PERIOD_I大于DRX周期,测量报告报告的周期是NC_REPORTING_PERIOD_I除DRX周期后,取最小整数倍的DRX周期时间
B.在分组空闲模式,如果NC_REPORTING_PERIOD_I小于DRX周期,报告周期就是DRX周期
C.在分组传输模式,测量报告报告周期就是NC_REPORTING_PERIOD_I。
D.以上描述都正确
第5题:
TheIBMNseriesmanagementproductthatwillprovidecentralizedmonitoring,reporting,datamanagementwithdetailedassetmanagementreportsthatarecustomizabletocapturespecific,relevantinformationandaddressbusinessneedsiscalled()?
A.MonitoringManager
B.ProtectionManager
C.OperationsManager
D.SupportManager
第6题: