Which of the following is referred to as sunk cost:A . management reserveB . contingency fundC . cost budgeted for construction under waterD . expended funds over which there is no further controlE . forecasted budget over-runs

题目

Which of the following is referred to as sunk cost:

A . management reserve

B . contingency fund

C . cost budgeted for construction under water

D . expended funds over which there is no further control

E . forecasted budget over-runs


相似考题
更多“Which of the following is referred to as sunk cost:A.management reserveB.contingency fundC ”相关问题
  • 第1题:

    57 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above.


    正确答案:C

  • 第2题:

    139 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above


    正确答案:C

  • 第3题:

    下列描述对OSPF描述准确的是()。

    A.OE1不计算OSPF内部COST值

    B.OE2不计算OSPF内部COST值

    C.ON1不计算OSPF内部COST值

    D.ON2计算OSPF内部COST值


    参考答案:B

  • 第4题:

    85 Project tradeoffs are usually made by comparing _____ and constraints.

    A. Time, cost, and quality

    B. Time, risk, and quality

    C. Risk, quality, and manpower availability

    D. Cost, quality, and technical performance

    E. Cost, quality, and risk


    正确答案:D

  • 第5题:

    You’re going to have a quiz ( )by another two in the ( )month.

    A. followed,followed

    B. followed,following

    C. following,followed

    D. following,following


    参考答案:B

  • 第6题:

    The trade term CIF is the abbreviation for ( ).
    A. Cost and Freight
    B. Cost,Insurance and Freight
    C. Cost, Insurance and Fee
    D. Clistoms, Inspection and Quarantine


    答案:B
    解析: