Cost management includes processes that are required to maintain financial control of projects. These processes may include:
A . economic evaluation
B . cost estimating
C . cost forecasting
D . B and C
E . All of the above.
第1题:
A(n) _____ system is designed to ensure the timely availability of nonhuman resources, and includes the cost in procurement, shipping/freight, storage and loss.
A . Inventory control.
B . Materials management.
C . Procurement.
D . All of the above.
E . A and C only.
第2题:
Range estimating in determining cost risk probabilities requires _____ .
A an amount of financial exposure.
B risks and opportunities ranked in order of bottom line importance
C contingency requirements for expected level of confidence
D probability of cost overrun occurrences
E All of the above.
第3题:
Which of the following types of contracts is equivalent to a cost plus contract:
A Fixed firm price
B Cost reimbursable
C Fixed price plus incentive fee
D progress payments
E All of the above.
第4题:
84 In which of the following cost estimating techniques are statistics models used:
A. nonparametric cost estimating
B. parametric cost estimating
C. life cycle cost estimating
D. bottom-up estimating
E. All of the above.
第5题:
166 In which of the following cost estimating techniques are statistics models used:
A. nonparametric cost estimating
B. parametric cost estimating
C. life cycle cost estimating
D. bottom-up estimating
E. All of the above
第6题:
● Which of the following are types of status reports?
A document, variance, trend and exception
B cost, trend, schedule and acquisition
C cost, schedule, technical performance
D analysis, cost, performance and schedule
E All of the above.
第7题:
● Scope management is:
A a project control function.
B employs change control.
C a work authorization process.
D considers Cost, Quality and Schedule.
E All of the above.
第8题:
“Cost of quality”is a project management concept that includes cost of( 73)
A.exceedings requirements
B.Changes to the requirements
C.Ensuring conformance to requirements
D.The quality control requirements
第9题:
Project(69)Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.
A.Integration
B.Scope
C.Configuration
D.Requirement
第10题:
第11题:
第12题:
Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.
第13题:
Cost management includes:
A . Cost estimating/forecasting.
B . Cost budgeting/cost control.
C . Cost applications.
D . All of the above.
E . A and B only.
第14题:
In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.
A unit price
B cost plus incentive fee
C cost plus fixed fee
D firm fixed price
E B and D only
第15题:
98 Cost management includes:
A. Cost estimating/forecasting.
B. Cost budgeting/cost control.
C. Cost applications.
D. All of the above.
E. A and B only
第16题:
127 Cost management includes processes that are required to maintain financial control of projects. These processes may include:
A. economic evaluation
B. cost estimating
C. cost forecasting
D. B and C
E. All of the above
第17题:
57 Which of the following are types of status reports?
A. document, variance, trend and exception
B. cost, trend, schedule and acquisition
C. cost, schedule, technical performance
D. analysis, cost, performance and schedule
E. All of the above.
第18题:
● Selection criteria for project selection include:
A cost versus benefit
B risk
C contribution towards organizational goals
D rate of return
E All of the above.
第19题:
● Project (69) Management includes the processes required to ensure thatthe project includes all the work required, and only the work required, tocomplete the project successfully.
t
A.Integration
B.Scope
C.Configuration
D.Requiremen
第20题:
Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.
A.Integration
B.Configuration
C.Scope
D.Requirement