During a project review meeting, you discover that your $250,000 project has a negative schedule variance of $20,000 which equates to 12% of the work scheduled to this point of time. You can therefore conclude that:
A . The project will be completed late.
B . The critical path has been lengthened.
C . the costs are being overrun.
D . Overtime will be required to maintain the original critical path.
E . None of the above.
第1题:
What's ( )job? Are ( ) British?
A. your, your
B. you, your
C. your, you
第2题:
A.http://project-hopE.cydF.gov.cn
B.http://project-hopE.cydF.ac
C.http://project-hopE.cydF.edu.cn
D.http://project-hopE.cydF.com.cn
第3题:
在对原理图进行电气规则检查前,可以()打开规则设置界面。
A.design-Document Options
B.Project-Project Options
C.Tools-Schematic Preferences
D.Project-Configuration Manager
第4题:
( ) – Is Miss White __________ English teacher, Maria?
– No, she teaches __________ geography.
A.your;my
B.you;mine
C.you;us
D.your;us
第5题:
执行菜单命令(),系统开始对项目进行编译,并生成信息报告
A.project/compile PCB project
B.project/project option
C.Design/netlist/protel
D.design/make project library
第6题:
以下选项中哪个选项是根路径的表达方法?
A.D:/Program Files/.Net/Project1
B./root/.Net/Project1
C../home/.Net/Project1
D.file://D:/Program Files/.Net/Project1