更多“The risk of accepting a lot of poor quality, in acceptance sampling, is referred to as:A.b ”相关问题
  • 第1题:

    85 Project tradeoffs are usually made by comparing _____ and constraints.

    A. Time, cost, and quality

    B. Time, risk, and quality

    C. Risk, quality, and manpower availability

    D. Cost, quality, and technical performance

    E. Cost, quality, and risk


    正确答案:D

  • 第2题:

    ● Project tradeoffs are usually made by comparing _____ and constraints.

    A Time, cost, and quality

    B Time, risk, and quality

    C Risk, quality, and manpower availability

    D Cost, quality, and technical performance

    E Cost, quality, and risk


    正确答案:D

  • 第3题:

    Whatisthetermthatisusedtodescribetheprocessofconvertingasignalfromdigitaltoanalog?()

    A.packetization

    B.quantization

    C.decoding

    D.sampling


    参考答案:C

  • 第4题:

    154 Project trade-offs vary between

    A. risk, cost and schedule.

    B. direct cost, indirect cost, and resource availability

    C. quality, schedule and time

    D. cost, quality and schedule

    E. contract terms, scope and budget


    正确答案:D

  • 第5题:

    Risk ( )acknowledge the existence of a threat ,but no proactive action is taken。

    A、avoidance

    B、transfer

    C、mitigate

    D、acceptance


    参考答案:D

  • 第6题:

    如果将合同的成立(agreement)用形象的公式来表示,以下选项正确的是()。

    A.offer + offer = agreement

    B.acceptance + acceptance = agreement

    C.offer + acceptance = agreement

    D.promise + promise = agreement


    offer + acceptance = agreement