78 The major difference between project and line management is that the project manager may not have any control over which basic management function?
A. Decision-making
B. Staffing
C. Rewarding
D. Tracking/monitoring
E. Reviewing
第1题:
A、给BIM模型赋予Presentor材质→制定Project计划→将Project文件与BIM模型链接→在Animator中制定关键动画并插入到Timeliner中→设置动画视点并输出施工模拟动画
B、制定Project计划→给BIM模型赋予Presentor材质→将Project文件与BIM模型链接→在Animator中制定关键动画并插入到Timeliner中→设置动画视点并输出施工模拟动画
C、在Animator中制定关键动画并插入到Timeliner中→给BIM模型赋予Presentor材质→制定Project计划→将Project文件与BIM模型链接→设置动画视点并输出施工模拟动画
D、在Animator中制定关键动画并插入到Timeliner中→制定Project计划→给BIM模型赋予Presentor材质→将Project文件与BIM模型链接→设置动画视点并输出施工模拟动画
第2题:
A.http://project-hopE.cydF.gov.cn
B.http://project-hopE.cydF.ac
C.http://project-hopE.cydF.edu.cn
D.http://project-hopE.cydF.com.cn
第3题:
在对原理图进行电气规则检查前,可以()打开规则设置界面。
A.design-Document Options
B.Project-Project Options
C.Tools-Schematic Preferences
D.Project-Configuration Manager
第4题:
Project (75).Management:includes the processes required to ensure that the project includes au the word required, and only the work required, to complete the project successfully.
A.Integration
B.Configuration
C.Scope
D.Requirement
第5题:
执行菜单命令(),系统开始对项目进行编译,并生成信息报告
A.project/compile PCB project
B.project/project option
C.Design/netlist/protel
D.design/make project library
第6题:
以下选项中哪个选项是根路径的表达方法?
A.D:/Program Files/.Net/Project1
B./root/.Net/Project1
C../home/.Net/Project1
D.file://D:/Program Files/.Net/Project1