A Project Status Report would include all of the following except:A Cost and schedule reportsB Changes to scope. cost or scheduleC Narrative explanation of variancesD Personnel problems on the projectE Upcoming activities

题目

A Project Status Report would include all of the following except:

A Cost and schedule reports

B Changes to scope. cost or schedule

C Narrative explanation of variances

D Personnel problems on the project

E Upcoming activities


相似考题
参考答案和解析
正确答案:D
更多“A Project Status Report would include all of the following except:A Cost and schedule reportsB Changes to scope. cost or scheduleC Narrative explanation of variancesD Personnel problems on the projectE Upcoming activities”相关问题
  • 第1题:

    What is the relative priority of project Cost, Schedule and Quality?

    A . 1)Cost - 2)Schedule - 3)Quality

    B . 1)Quality - 2)Schedule - 3)Cost

    C . 1)Quality - 2)Cost - 3)Schedule

    D . 1)Schedule - 2)Quality - 3)Cost

    E . All are of equal priority


    正确答案:E

  • 第2题:

    In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.

    A unit price

    B cost plus incentive fee

    C cost plus fixed fee

    D firm fixed price

    E B and D only


    正确答案:D

  • 第3题:

    130 What is the relative priority of project Cost, Schedule and Quality?

    A. 1)Cost - 2)Schedule - 3)Quality

    B. 1)Quality - 2)Schedule - 3)Cost

    C. 1)Quality - 2)Cost - 3)Schedule

    D. 1)Schedule - 2)Quality - 3)Cost

    E. All are of equal priority


    正确答案:E

  • 第4题:

    57 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above.


    正确答案:C

  • 第5题:

    95 A Project Status Report would include all of the following except:

    A. Cost and schedule reports

    B. Changes to scope. cost or schedule

    C. Narrative explanation of variances

    D. Personnel problems on the project

    E. Upcoming activities


    正确答案:D

  • 第6题:

    96 A negative cost variance and positive schedule variance means:

    A. The project is under budget and ahead of schedule

    B. The project is over budget and behind schedule

    C. The project is over budget and ahead of schedule

    D. The project will be overrun but ahead of schedule at completion


    正确答案:C

  • 第7题:

    ● Which of the following are types of status reports?

    A document, variance, trend and exception

    B cost, trend, schedule and acquisition

    C cost, schedule, technical performance

    D analysis, cost, performance and schedule

    E All of the above.


    正确答案:C

  • 第8题:

    ● The Work Breakdown Structure (WBS) is the basis for communicating:

    A Project scope, cost control, schedule, quality

    B Project objectives, dependencies, plan, cost control

    C Project scope, schedule, staffing, cost control

    D Project scope, quality, schedule, dependencies

    E Project budget, schedule, risk factors, work assignments.


    正确答案:A

  • 第9题:

    Schedule control is concerned with all the following except (74)

    A.influencing the factors that create schedule changes to ensure that the changes are beneficial

    B.determing that the schedule has changed

    C.managing the actual changes when and as they occur

    D.changing the shedule based on customer demands


    正确答案:D
    进度控制的内容:(1)确定项目进度的当前状态(2)对引起进度变更的因素施加影响,以保证这种变化朝着有利的方向发展(3)确定项目进度已经变更(4)当变更发生时管理实际的变更D选项“基本客于的需求改变进度”。依据PMBOK定义及上述内容,D选项不属于进度控制内容。

  • 第10题:

    In all projects,needs must be tempered by schedule,cost and resource constraints.Project success depends primarily on (74)

    A.the quality of the schedule and cost control analysis

    B.customer satisfaction

    C.customer compromise in defining its needs

    D.exceeding customer requirements through gold-plating


    正确答案:B
    所有项目中,客户的要求必须根据进度表、成本和有限的资源进行修改。项目的成功主要取决于:A进度表和成本控制分析的优劣B.客户满意程度C客户在确定要求时的折衷态度D通过漂亮的外包装超额满足客户的要求所以答案选B。

  • 第11题:

    An example of scope verification is ().

    • A、review the performance ofan installed software module
    • B、managing changes to the project schedule
    • C、decomposing the WBS to a work package level
    • D、performing a benefit/cost analysis to determine if we should proceed with the project

    正确答案:A

  • 第12题:

    单选题
    You are working on the cost budget for one project. Which of the following is true()
    A

    This process assigns cost estimates to project activities including risks and contingency plans.

    B

    The cost baseline will be used to measure variances and future project performance.

    C

    This process assigns cost estimates for expected future period operating costs.

    D

    The cost baseline is the expected cost for the project.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A negative cost variance and positive schedule variance means:

    A The project is under budget and ahead of schedule

    B The project is over budget and behind schedule

    C The project is over budget and ahead of schedule

    D The project will be overrun but ahead of schedule at completion


    正确答案:C

  • 第14题:

    42 In which of the following types of contracts is it most important for the contractor to maintain control of cost, schedule and scope changes.

    A. unit price

    B. cost plus incentive fee

    C. cost plus fixed fee

    D. firm fixed price

    E.B and D only


    正确答案:D

  • 第15题:

    41 The scope of a project can be expected to change if:

    A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs

    C. The project manager is assigned after the project is defined, and the cost and schedule are approved

    D. A clear objective is not provided

    E. All of the above are possible based upon the situation


    正确答案:E

  • 第16题:

    72 Project trade-offs vary between

    A. risk, cost and schedule.

    B. direct cost, indirect cost, and resource availability

    C. quality, schedule and time

    D. cost, quality and schedule

    E. contract terms, scope and budget


    正确答案:D

  • 第17题:

    You are working on the cost budget for one project. Which of the following is true()

    A.This process assigns cost estimates to project activities including risks and contingency plans.

    B.The cost baseline will be used to measure variances and future project performance.

    C.This process assigns cost estimates for expected future period operating costs.

    D.The cost baseline is the expected cost for the project.


    参考答案:B

  • 第18题:

    139 Which of the following are types of status reports?

    A. document, variance, trend and exception

    B. cost, trend, schedule and acquisition

    C. cost, schedule, technical performance

    D. analysis, cost, performance and schedule

    E. All of the above


    正确答案:C

  • 第19题:

    ● The scope of a project can be expected to change if:

    A The project manager must provide cost estimates without having a design concept

    B Oversimplification (underestimating) of the nature of the work occurs

    C The project manager is assigned after the project is defined, and the cost and schedule are approved

    D A clear objective is not provided

    E All of the above are possible based upon the situation


    正确答案:E

  • 第20题:

    An example of scope verification is __(73)__ .

    A.review the performance of an installed software module

    B.managing changes to the project schedule

    C.decomposing the WBS to a work package level

    D.performing a benefit/cost analysis to determine if we should proceed with the project


    正确答案:A
    评价一个已安装的软件模块的性能属于范围确认的范畴,其他三项都与范围确认没有直接关系。

  • 第21题:

    Schedule control is concerned with all the following except ( )

    A.influencing the factors that create schedule changes to ensure that the changes are beneficial

    B.determing that the schedule has changed

    C.managing the actual changes when and as they occur

    D.changing the shedule based on customer demands


    正确答案:D
    进度控制的内容:(1)确定项目进度的当前状态(2)对引起进度变更的因素施加影响,以保证这种变化朝着有利的方向发展(3)确定项目进度已经变更(4)当变更发生时管理实际的变更D选项“基本客于的需求改变进度”。依据PMBOK定义及上述内容,D选项不属于进度控制内容。

  • 第22题:

    ( )is a process of monitoring the status of the project to update the project costs and manage changes to the cost baseline

    A.Plan Cost Management
    B.Estimate Costs
    C.Determine Budget
    D.Control Costs

    答案:D
    解析:
    控制成本是一个监控项目状态的过程,目的是更新项目成本并且对成本基准的变化进行管理。

  • 第23题:

    You are working on the cost budget for one project. Which of the following is true()

    • A、This process assigns cost estimates to project activities including risks and contingency plans.
    • B、The cost baseline will be used to measure variances and future project performance.
    • C、This process assigns cost estimates for expected future period operating costs.
    • D、The cost baseline is the expected cost for the project.

    正确答案:B