In which of the following is the cost of risk hidden by the contractor?
A Firm Fixed Price Contract
B Fixed Price Plus Incentive
C Cost Plus Fixed Price
D Cost Plus Percentage of Cost
E A and B
第1题:
85 Project tradeoffs are usually made by comparing _____ and constraints.
A. Time, cost, and quality
B. Time, risk, and quality
C. Risk, quality, and manpower availability
D. Cost, quality, and technical performance
E. Cost, quality, and risk
第2题:
● Project tradeoffs are usually made by comparing _____ and constraints.
A Time, cost, and quality
B Time, risk, and quality
C Risk, quality, and manpower availability
D Cost, quality, and technical performance
E Cost, quality, and risk
第3题:
Cost,fixed 固定成本
一企业在某时段即使在产量为零时也会发生的成本。总固定成本由诸如利息支出、抵押支出、管理者费用等契约性开支所组成。
第4题:
154 Project trade-offs vary between
A. risk, cost and schedule.
B. direct cost, indirect cost, and resource availability
C. quality, schedule and time
D. cost, quality and schedule
E. contract terms, scope and budget
第5题:
_____
[A] thought [B] sight [C] cost [D] risk
本题测试词义搭配。空格相关意思是“一想到他即将要做的,即使他自己也….” “At thought of ”意为“一看到…”; at sight of意为年“一看见”;at cost of 意为“以…的代价”;at risk of意为“冒着….的危险”,所以选A
第6题:
A. followed,followed
B. followed,following
C. following,followed
D. following,following