第1题:
88 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phase
B. Development of design phase
C. Execution phase.
D. Termination phase.
E. None of the above
第2题:
A.Prepare
B.Plan
C.Design
D.Operate
第3题:
Which online Cisco resource provides PPDIOO and Lifecycle Services methodology?()
第4题:
During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()
第5题:
When using the steps to success methodology, where does Quote Builder fit into the deal process flow?()
第6题:
During which boot phase is the rootvg first activated()
第7题:
Cisco Product Advisor
Steps to Success Portal
Secure Business Advisor
Cisco Solution Designer
第8题:
Phase 1
Phase 2
Phase 3
POST Phase
第9题:
Prepare
Design
Position
Develop
Plan
Perform
第10题:
Perform
Position
Develop
Prepare
Plan
Design
第11题:
Escalating the problem
Testing the solution and identifying the effects
Continuing to gather information about the same symptoms
Documenting the solution and the entire process
第12题:
Boot phase 1
Boot phase 2
Boot phase 3
Boot phase 4
第13题:
Development is a structured design methodology that proceeds in a sequence from one phase to the next.
A.Waterfall
B.Phased
C.Prototyping
D.Parallel
第14题:
Which of the following options lists the steps in PPP session establishment in the correct order?()
第15题:
During which phase of the Steps to Success methodology for Cisco SMB Security Solutions would the Security Technology Requirements document be used to determine a customer’s security requirements?()
第16题:
When determining a customer’s security requirements using the security site survey from the steps for success methodology, which three of theses should be included in the customer’s security policy and procedures?()
第17题:
During which phase of the boot process is the rootvg volume group varied on and the root file system (hd4) checked?()
第18题:
Regarding an IPsec security association (SA), which two statements are true?()
第19题:
Optional authentication phase, link establishment phase, network layer protocol phase.
Network layer protocol phase, link establishment phase, optional authentication phase.
Network layer protocol phase, optional authentication phase, link establishment phase.
Link establishment phase, network layer protocol phase, optional authentication phase.
Link establishment phase, optional authentication phase, network layer protocol phase.
Optional authentication phase, network layer protocol phase, link establishment phase.
第20题:
IKE SA is bidirectional.
IPsec SA is bidirectional.
IKE SA is established during phase 2 negotiations.
IPsec SA is established during phase 2 negotiations.
第21题:
project planning
configuration management
wireless readiness assessment
systems acceptance testing
site readiness specification
第22题:
Position
Prepare
Design
Perform
Plan
第23题:
It encompasses the validate and solve steps
It encompasses the Discovery, Validate and Solve steps
It encompasses the Discover, Validate, Solve and Present Steps
It encompasses the Discovery, Solve and Close steps
It encompasses the Discovery, Validate and Present Steps
第24题:
Prepare
Plan
Design
Operate